Laserfiche WebLink
ii <br /> SECOR WYA01 oocor.Goal <br /> INTERNATIONAL 3017 Kilgore Road, Suite 100 <br /> ai RINCORPORATED Rancho Cordova, CA 95570 <br /> 916-851 -0400 TEL <br /> 913-861-0450 FAX <br /> I <br /> i <br /> I <br /> December 19, 2006 <br /> i <br /> Ms. Lori Duncan <br /> San Joaquin County <br /> Environmental Health Department <br /> 304 East Weber Avenue, Third Floor <br /> Stockton, CA 95202 <br /> RE: Revised Work Plan for Biosparging Feasibility Testing <br /> ARCO Service Station 548 <br /> 1612 West Hammer Lane <br /> Stockton , California <br /> SECOR Project No. : 77BP.0548.00.0136 <br /> Dear Ms. Duncan: <br /> This letter, prepared by SECOR International Incorporated (SECOR) on behalf of Atlantic <br /> Richfield Company, a BP Affiliated Company, addresses the comments in the San Joaquin <br /> County Environmental Health Department (SJCEHD) letter dated November 2, 2006 <br /> (Attachment A) and the comments discussed at the meeting in your office on December 7, <br /> 2006. The letter was prepared in response to the SECOR workplan dated October 17, <br /> 2006. The purpose of the work plan was to present the plan for conducting the required <br /> feasibility testing. The results of this test will be used to determine if biosparging is an <br /> appropriate remedial alternative for ARCO Service Station 548. <br /> The previously submitted work plan contained a summary of previous site assessments, a <br /> summary of known sensitive receptors in the area, and a description of the current status of <br /> the dissolved-phase plumes. This revised work plan details the scope of work proposed for <br /> the biosparging feasibility testing. <br /> SITE DESCRIPTION <br /> The site is located at the southwest corner of West Hammer Lane and Brentwood Drive in <br /> the City of Stockton, California (Figure 1 ). The site was formerly operated as an ARCO <br /> Service Station and AM/PM mini-mart. The site currently operates as a Valero gasoline <br /> service station and mini-mart. Current site facilities include four underground storage tanks <br /> (USTs); two pump islands, associated product lines and dispensers, and a convenience <br /> store. <br /> PROPOSED SCOPE OF WORK <br /> The proposed scope of work included in this work plan consists of collecting baseline data, <br /> operating the biosparging system, and a plan for evaluating the effectiveness of biosparging <br /> at ARCO 548. The locations of the air sparge (AS) wells are shown on Figure 2. The wells <br /> are located near and downgradient of the USTs in areas of the maximum concentrations. <br />