Laserfiche WebLink
Work Plan for SVE/AS Feasibility i esting <br /> ARCO Service Station 548 <br /> Stockton, California <br /> Page 6 of 9 <br /> SCHEDULE <br /> SECOR and the Execution Contractor are prepared to initiate field activities upon approval <br /> of this work plan by the SJEHD . We anticipate that field work and reporting will require <br /> approximately 12 to 16 weeks to complete, following the receipt of a valid SVE/AS <br /> operation permit from APCD . <br /> REFERENCES <br /> URS , 2004. Site Conceptual Model Update Report, ARCO Service Station 548 . 23 <br /> November. <br /> LIMITATIONS <br /> This report presents our understanding of existing conditions at the subject site . The <br /> conclusions contained herein are based on the analytical results , and professional <br /> J udgment in accordance with current standards of professional practice; no other warranty <br /> is expressed or implied . SECOR assumes no responsibility for exploratory borings or data <br /> reported by other consultants or contractors . <br /> Should you have any questions regarding this project, please feel free to contact the <br /> undersigned at (916) 861 -0400 ext 229. <br /> Sincerely, <br /> SECOR International Incorporated <br /> Prepared by: Reviewed by: CWF <br /> 1 la�OO&� Aj�e ,& C <br /> Kristin Shelton Rusty Benkos * EM INIroB <br /> Associate Engineer Principal Eng ineer9� Cs�L V <br /> O� CALI,� / <br /> Figure 1 Site Location Map <br /> Figure 2 Site Plan <br /> Table 1 Well Construction Summary <br /> Table 2 Groundwater Elevation and Analytical Data <br /> Table 3 Fuel Oxygenates Analytical Data <br /> Table 4 Groundwater Gradient <br /> cc: Mr. James Barton , Regional Water Quality Control Board , Central Valley Region <br /> Mr. Don Pratt, Atlantic Richfield Company <br />