My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1612
>
3500 - Local Oversight Program
>
PR0545246
>
WORK PLANS_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 3:30:38 PM
Creation date
1/30/2020 1:51:42 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 1
RECORD_ID
PR0545246
PE
3528
FACILITY_ID
FA0003611
FACILITY_NAME
PARKWOODS GAS & FOOD
STREET_NUMBER
1612
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
07728002
CURRENT_STATUS
02
SITE_LOCATION
1612 W HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Former ARCO Service Station No. 5� R C 0 R — — <br /> Work Plan for Well Destruction <br /> March 12, 2008 <br /> Page 5 <br /> LIMITATIONS <br /> This report was prepared in accordance with the scope of work outlined in SECOR's contract and <br /> with generally accepted professional engineering and environmental consulting practices existing at <br /> the time this report was prepared and applicable to the location of the site. It was prepared for the <br /> exclusive use of ARC , a BP affiliated company, forthe express purpose stated above. Any re-use of <br /> this report for a different purpose or by others not identified above shall be at the user's sole risk <br /> without liability to SECOR. To the extent that this report is based on information provided to SECOR <br /> by third parties, SECOR may have made efforts to verify this third party information, but SECOR <br /> cannot guarantee the completeness or accuracy of this information . The opinions expressed and <br /> data collected are based on the conditions of the site existing at the time of the field investigation . <br /> No other warranties, expressed or implied are made by SECOR. <br /> Prepared by: Reviewed by: <br /> RR ger ark Brian Westhoff <br /> Staff Geologist Senior Geologist <br /> All information , conclusions, and recommendations provided by SECOR in this document regarding <br /> the site have been prepared under the supervision of and reviewed by the licensed professional <br /> whose signature appears below. <br /> Licensed Approver: QROFESs/0 <br /> B q<<^c <br /> RustI" G w 5839 m <br /> n kosky, P W X <br /> Principal Enginee * EXP. 12/3112008 <br /> March 12, 2008 dj CIV0, <br /> �rFOF CAL\FOS <br /> ADDENDUMS <br /> Figure 1 Site Location Map <br /> Figure 2 Site Plan <br /> Table 1 Well Construction Details <br /> Attachment SJC/EHD Correspondence <br /> Attachment B Boring Log <br /> cc: Mr. James Barton , California Regional Water Quality Control Board — Central Valley Region <br /> Mr. Jasper Cheema, First Evergreen Oil Corporation <br /> Mr. Sergio Morescalchi, ARC , a BP affiliated company (upload to Enfos) <br /> Upload to Geotracker <br /> 548 Work Plan for Well Destruction.doc SECOR Intemational Incorporated <br />
The URL can be used to link to this page
Your browser does not support the video tag.