My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1612
>
3500 - Local Oversight Program
>
PR0545246
>
SITE INFORMATION AND CORRESPONDENCE_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 4:05:50 PM
Creation date
1/30/2020 1:53:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 2
RECORD_ID
PR0545246
PE
3528
FACILITY_ID
FA0003611
FACILITY_NAME
PARKWOODS GAS & FOOD
STREET_NUMBER
1612
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
07728002
CURRENT_STATUS
02
SITE_LOCATION
1612 W HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECOR www.secor.com <br /> 1NTERN,..*bNAL 3017 Kilgore Road,Suite 100 <br /> S E C 0 R INCORPORATED Rancho Cordova,CA 95670 <br /> v 916-861-0400 TEL <br /> 916-861-0430 FAX <br /> October 25, 2007 OC j 2 c UG7 r <br /> Lincoln Properties EIVV1RO f.f��—, <br /> 374 Lincoln Center 'c R�vilT EpVi('E.Th' <br /> Stockton, CA 95207 <br /> Subject: Permission to Install One Groundwater Monitoring Well on Your Property Located at <br /> 1614-1738 Hammer Lane, Stockton, California <br /> Dear Lincoln Properties: <br /> On behalf of BP West Coast Products LLC, SECOR International Inc. (SECOR) is requesting your <br /> permission to monitor and sample the existing monitoring well PW-1, and to drill and install one <br /> groundwater monitoring well on your property, located at 1614-1738 Hammer Lane in Stockton, <br /> California. The installation of the well is part on an ongoing soil and groundwater investigation for <br /> the ARCO Facility 548 located at 1612 Hammer Lane in Stockton, California. The well will be <br /> installed at the approximate location shown on the attached Figure. The well would be <br /> approximately 40 feet deep and would be enclosed in a 12-inch diameter steel traffic box mounted <br /> flush with the ground surface. After the well is installed, it will be sampled on a quarterly basis for an <br /> undetermined period of time. The additional investigation for this facility is being required by the <br /> San Joaquin County Environmental Health Department(County). <br /> Enclosed are two copies of a modified access agreement that has been prepared for you and BP <br /> West Coast Products LLC. If you agree with the terms of the access agreement, please sign both <br /> copies and return both to SECOR. We will forward the agreements to BP West Coast Products LLC <br /> for their signature and one fully executed agreement will be sent back to you. <br /> If you have any questions, please contact me at(916) 861-0400 ext 270. <br /> Sincerely, <br /> SECOR International Incorporated <br /> Brian Westhoff <br /> Senior Geologist <br /> cc: Sergio Morescalchi, Atlantic Richfield Company(uploaded to Enfos) <br /> Lori Duncan, San Joaquin County Environmental Health Department <br />
The URL can be used to link to this page
Your browser does not support the video tag.