My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1612
>
3500 - Local Oversight Program
>
PR0545246
>
SITE INFORMATION AND CORRESPONDENCE_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 4:05:50 PM
Creation date
1/30/2020 1:53:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 2
RECORD_ID
PR0545246
PE
3528
FACILITY_ID
FA0003611
FACILITY_NAME
PARKWOODS GAS & FOOD
STREET_NUMBER
1612
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
07728002
CURRENT_STATUS
02
SITE_LOCATION
1612 W HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
l(a <br /> San Joaquin County DIRECTOR <br /> Donna Heran,REHS <br /> Environmental Health Department ASSISTANT DIRECTOR <br /> 600 East Main Street Laurie Cotulla, REHS <br /> -3029 <br /> Stockton, California 95202 PROGRAM COORDINATORS <br /> W <br /> Carl Borgrnan, REHS <br /> Mike Huggins,REHS,RD] <br /> 7Website: www.sjgov.org1ehd <br /> Margaret Lagorio,REHS <br /> Phone: (209)468-3420 Robert McClellon,REHS <br /> Fax: (209) 464-0138 Jeff Carruesco,REHS,R01 <br /> Kasey Foley,REHS <br /> SERGIO MORESCALCHI <br /> ATLANTIC RICHFIELD COMPANY SEP 7 2007 <br /> 1 <br /> P 0 BOX 1257 <br /> SAN RAMON CA 94583 <br /> RE: ARCO/BP Sites in San Joaquin County <br /> A meeting was held on September 13, 2007, at the office of San J.oaqw'n County Environmental <br /> Health Department (EHD). Attending the meeting were yourepiesentiAg ARCO/BP,Rusty <br /> Benkosky and Brian Westhoff representing SECOR, Margaret Lakorio,Nuel C. Henderson,Michael <br /> Infurna,Lori Duncan, and Vicki McCartney representing EHD. The following is a synopsis of the <br /> status and/or site specific discussions at the meeting. <br /> 2478 E. Oak Street,Stocktori,#443 <br /> The report on the installation of the new wells should be submitted to EHD soon. It has been <br /> about three months since the work was completed. <br /> 1612 Hammer Lane, Stockton, #548 <br /> The off-site property owners have not signed the access agreements for installation of wells on their <br /> property. SECOR will send another request and if there is still no cooperation EHD will request <br /> cooperation once SECOR provides copies of correspondence sent to-those property owners. <br /> SECOR will check into putting the well to the east in the public right-of way. The City of Stockton <br /> is making improvements along Hammer Lane and some of the wells at 1612 Hammer may need to <br /> be destroyed. The EHD will provide more information on this when it becomes available. <br /> 6100 N. Highway 99, Stockton, #595 <br /> Monitoring of the two wells remaining for this site will continue until the California Department of <br /> Transportation has completed construction of the highway interchange. <br /> 7906 N. El Dorado Street,Stockton, #2130 <br /> New wells have been installed for the site. The on-site vapor well will be scheduled for destruction <br /> soon. <br /> 441 Charter Way,Stockton, #2168 <br /> The inlet on the air sparge system melted so the system is not ope rating. Once the inlet is repaired <br /> and the system is modified it will resume operation. The sod vapor extraction system is operating. <br /> 3212 N. California Street, Stockton, #2186 <br /> The EHD approved the soil vapor extraction rebound test plan. A Site Conceptual Model should be <br /> submitted to EHD this week. A response to moving VP-1 will be submiited to EHD in a week. <br /> 205 N. Center Street, Stockton, #4493 <br /> ARCO plans to continue monitoring the contaminant plume from this site. The EHD previously <br /> recommended batch extraction of groundwater in the area of the MW4/M\,Vg/MW12 well cluster to <br /> .reduce mass and speed up the possibility of closure. ARCO was concerned it would move more <br />
The URL can be used to link to this page
Your browser does not support the video tag.