Laserfiche WebLink
y <br /> tw <br /> August 6, 1991 <br /> ARCO Station No. 548 <br /> f ti <br /> FIELD PROCEDURES <br /> Plan <br /> S'ste afe�t L— <br /> GeoSystems p <br /> ersonnel in accordance with a <br /> Applied Field work will be performed by pp officer. <br /> ed b lite Applied GeoSystems Health and Safety <br /> c') attached site safety plan develop Y <br /> ascribes the basic safety requirements for the subsurface investigation and the <br /> This plan d plan is applicable to personnel and <br /> drilling of soil borings at the work site. The site safety p geologist will be the Site <br /> A <br /> subcontractors of Applied GeoSystems. The Applied GeoSystems g <br /> onsite. Personnel at the site will be informed of the contents of the site safety <br /> Safety Officer fety plan will be kept at the work site and will <br /> gins. A copy <br /> of the site sa <br /> plan before work be <br /> opriate parties during the work. <br /> be available for reference by appr <br /> ns the site safety plan. <br /> Appendix B contai { <br /> Soil Borings and Sam fin <br /> s are <br /> are drilled and groundwater monitoring wells and vadosepublic Health ' <br /> Before soil borings <br /> constructed at the site, permits will be obtained from ndhS Nic Alert at east 48 hours <br /> Services. Applied GeoSystems will contact Underground <br /> locate public utility lines at the site. The soil boring locations <br /> sk <br /> before drilling to help rade to reduce i <br /> be in hand-aug <br /> eyed to a depth of approximately 5 feet below g <br /> of damaging underground utilities or structures. A licensed well driller will drill the soli <br /> borings and install the wells. <br /> 7 <br /> AGS 3M 4 <br />