Laserfiche WebLink
August 6, 1991 <br /> ARCO Station No.548 <br /> Rannrt Preparation <br /> repare a Preliminary Investigation and Evaluation Report in accordance with <br /> We wP P <br /> California Regional Water Quality Control BoardcmlC'�dat��nslasbua�Qry7�Tguits, <br /> tile <br /> methods, procedures, soil stratigraphy in the borings, <br /> s whether remediation of <br /> hydrocarbon distribution, and conclusions. This report will addres , <br /> If the extent of <br /> ssolved, or free <br /> soil and ground water is necessary. 11 pre paare'�Problem Assessrnent <br /> hydrocarbons is delineated during this investigation,we will pre <br /> Report in accordance with California Regional Water Quality Control Board <br /> _ pthe study will be considered confidential <br /> recommendations. Information gathered during <br /> and will be released only with the authorization of ARCO. <br /> PROJECT STAFF <br /> John Hailey Bobbitt,a Registered Geologist in the State of <br /> Mr. California(R.G.4313),will <br /> e in charge of this project. Mr.Jay R.Johnson, Project Geologist,will manage held and <br /> b g <br /> office operations. Applied GeoSystems employs a staff of geologists, engineers, and <br /> technicians who will help complete the project. <br /> 14 <br /> AGS 3DW4-4 <br />