Laserfiche WebLink
PIED PROCEDURES FOR PREVIOUS WORK <br /> �d Site Safety Plan <br /> Field work performed by Applied GeoSystems at the site was conducted in accordance with <br /> Applied Geosystems' Site Safety Plan. This plan describes the safety requirements for <br /> drilling soil borings at the site. The Site Safety Plan is applicable to personnel and <br /> subcontractors of Applied GeoSystems. Applied GeoSystems'personnel and subcontractors <br /> scheduled to perform work at the site were briefed on the contents of the Site Safety Plan <br /> before work began. A copy of the Site Safety Plan was available for reference by <br /> appropriate parties during the work. The onsite Staff Geologist of Applied GeoSystems <br /> acted as the Site Safety Officer. <br /> r�) <br /> ms notified Underground Service Alert of our intent to <br /> Before drilling,Applied GeoSyste <br /> drill so that approximate locations of underground utility lines and structures could be <br /> marked.-.We hand-augered each boring to a depth of approximately 5 feet below grade to <br /> attempt to locate uncerground structures. The borings were drilled with a CME 55 drill rig <br /> equipped with 8-inch-diameter, hollow-stem augers. <br /> J�oj Sampling in-B-o—rinnij <br /> Soil samples were collected at 5-foot intervals from the ground surface to the fu,11depth of <br /> thG borings. The soil samples were collected by advancing the boring to a point im nediately <br /> above the sampling depth, and then driving a California-modified, split-spaori sampler <br /> containing equipped with clean brass sleeves through the hollow center.of the auger in.o <br /> the undisturbed native soil. The sampler and brass sleeves were steam-cleaned car washed <br /> thoroughly with; <br />