My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012708
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1612
>
3500 - Local Oversight Program
>
PR0545246
>
ARCHIVED REPORTS_XR0012708
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 3:56:58 PM
Creation date
1/30/2020 2:01:06 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012708
RECORD_ID
PR0545246
PE
3528
FACILITY_ID
FA0003611
FACILITY_NAME
PARKWOODS GAS & FOOD
STREET_NUMBER
1612
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
07728002
CURRENT_STATUS
02
SITE_LOCATION
1612 W HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
237
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Z <br /> 61APPA, �e0systems 4141-E Power Inn Road,Sacramento,CA 95826 19161 452-29 <br /> 01 <br /> • FREMONT a IRVINE + HOUSTON a BOSTON a SACRAMENTO a CULVER CITY O SAN JOSE <br /> SITE SAFETY PLAN No. 30004-3S <br /> eW SUBSURFACE ENVIRONMENTAL INVESTIGATION <br /> at the <br /> ARCO Service Station No. 548 <br /> 1612 Hammer Lane <br /> Stockton,California <br /> (December 17, 1990) <br /> INTRODUCTION <br /> This Site Safety Plan describes basic safety requirements for the subsurface environmental <br /> investigation. The provisions set forth in this Plan apply to the employees of Applied <br /> GeoSystems and its subcontractors working on this phase of the project. The subcontractors <br /> may elect to modify these provisions, but only to upgrade or increase the safety <br /> requirements, and only with the concurrence of Applied GeoSystems., as designated and <br /> accepted in writing. <br /> r—*� This Site Safety Plan will address the expected potential hazards that may be encountered <br /> on the worksite for this project. Field activities are planned to begin upon approval of the <br /> work plan by the San Joaquin County Environmental Health Division with the duration <br /> estimated at approximately 1 month affer.the start date. If changes in site or working . <br /> conditions occur as activities progress, addenda to this pian will be provided by Applied <br /> s GeoSystems. <br /> AUTHORITY FOR SI'Z'E SAFETY <br /> The Applied GeoSystems personnel responsible for project safety are the Project Manager <br /> ® and the Staff Geologist or Engineer. The Health and Safety Coordinator is responsible for <br /> the overall Applied GeoSystems Heaith and Safety Program and may choose to audit the ; <br /> site for compliance and take appropriate action to correct deficiencies. The Project <br /> Manager is responsible for implementing the provisions of this Plan, for providing a copy <br /> Of this Plan to the Staff Geologist or Engineer, and for advising the Staff Geologist or <br /> Engineer on health and safety matters. The Project Manager and Staff Geologist or <br /> Engineer have the authority to audit site activities for compliance with the provisions of this <br /> - Plash: They may suspend;or-,modify work practices or dismiss subcontractors whose conduct <br /> does not meet the requirements specified in this Plana <br /> The.Staff Geologist or Engineer is responsible for communicating the information contained <br /> in:this Plan to the Applied GeoSystems personnel.assigned to the project and to the <br /> ach subcontractor.working for Applied GeoSystems on the <br /> responsible representative of e <br /> project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.