My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0001966
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1612
>
3500 - Local Oversight Program
>
PR0545246
>
ARCHIVED REPORTS_XR0001966
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 7:55:30 PM
Creation date
1/30/2020 2:18:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001966
RECORD_ID
PR0545246
PE
3528
FACILITY_ID
FA0003611
FACILITY_NAME
PARKWOODS GAS & FOOD
STREET_NUMBER
1612
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
07728002
CURRENT_STATUS
02
SITE_LOCATION
1612 W HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Date May 17, 1996 <br /> ARCO QUARTERLY GROUNDWATER MONITORING REPORT <br /> Facility No 00548 Address 1612 Hammer Lane, Stockton, California <br /> ARCO Environmental Engineer Kyle Christie <br /> Consulting Go/Contact Person EMCON/Jay R Johnson <br /> Consultant Project No 20805-140 005 <br /> Primary Agency/Regulatory ID No Mary Meays, San Joaquin County Public Health Services <br /> WORKED PERFORMED THIS QUARTER (First- 1996) <br /> 1 Performed quarterly groundwater sampling <br /> 2 Compiled and evaluated groundwater monitoring data <br /> 3 On January 31, 1996, EMCON prepared and submitted a second access agreement to the property <br /> owner south of the site (Lincoln Properties) <br /> WORKED PROPOSED FOR NEXT QUARTER (Second- 1996) <br /> 1 ARCO will continue to perform quarterly groundwater monitoring The next sampling event is <br /> tentatively scheduled for May 1996 <br /> Current Phase of Project Monitoring/Assessment <br /> Frequency of Groundwater Sampling Quarterly <br /> Frequency of Groundwater Monitoring Quarter) <br /> Is Free Product (FP) Present On Site No <br /> FP Recovered this Quarter None <br /> Cumulative FP Recovered to Date None <br /> Approximate Depth to Groundwater 57 00 to 63 80 <br /> Groundwater Gradient East <br /> 0 003 <br /> DISCUSSION (optional) <br /> Results of this monitoring event indicated that levels of dissolved gasoline hydrocarbons are consistent <br /> with levels detected during previous sampling events Groundwater gradient is consistent with previous <br /> sampling events Groundwater elevation increased approximately 1 96 feet from the previous sampling <br /> event (December 1995) <br /> ATTACHMENTS <br /> • Table 1 Groundwater Monitoring Data <br /> • Figure 1 Site Vicinity Map <br /> • Figure 2 Generalized Site Plan <br /> • Figure 3 Groundwater Contour Map (February 2, 1996) <br />. • Appendix A Sampling and Analysis Procedures <br /> • Appendix B Laboratory Analysis Reports and Chain-of-Custody Records <br /> cc Elizabeth Thayer, RWQCB <br /> SACW V'JM805\08051400 5AS 95\cjb L <br />
The URL can be used to link to this page
Your browser does not support the video tag.