My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002989
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1612
>
3500 - Local Oversight Program
>
PR0545246
>
ARCHIVED REPORTS_XR0002989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 8:20:52 PM
Creation date
1/30/2020 3:11:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002989
RECORD_ID
PR0545246
PE
3528
FACILITY_ID
FA0003611
FACILITY_NAME
PARKWOODS GAS & FOOD
STREET_NUMBER
1612
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
07728002
CURRENT_STATUS
02
SITE_LOCATION
1612 W HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Date: July 28,2004 <br /> Quarter: 2°a Quarter,2004 <br /> ARCO QUARTERLY GROUNDWATER MONITORING REPORT <br /> Facility No.: 548 <br /> Address: 1612 Hammer Lane, Stockton, CA <br /> ARCO Environmental Engineer: Paul Supple <br /> Consulting Co./Contact Person: URS/Vernon Elarth <br /> Consultant Project No.: 38466395.OL058 <br /> Primary Agency/Regulatory ID No.: Lori Duncan, San Joaquin County Environmental Health <br /> Department <br /> WORK PERFORMED THIS QUARTER (First 2004): <br /> 1. Performed quarterly groundwater monitoring and sampling. VW-5S was unable to be sampled due to <br /> insufficient water. <br /> 2. Prepared and submitted quarterly groundwater monitoring report. <br /> 3. Performed operation and maintenance of the SVE and AS systems.System shut down on June 9,2004. <br /> WORK PROPOSED FOR NEXT QUARTER (Second 2004): <br /> 1. Perform quarterly groundwater monitoring and sampling. <br /> 2. Prepare and submit quarterly groundwater monitoring report. <br /> . 3. Prepare site conceptual model. <br /> 4. Prepare response to County's request for a workplan for additional assessment. <br /> QUARTERLY RESULTS SUMMARY (First 2004): <br /> Current Phase of Project: Monitoring <br /> Frequency of Groundwater Sampling: Wells MW-1 through MW-6 and VW-1 through VW-4, <br /> VW-5S, and VW-5D sampled Quarterly <br /> Frequency of Groundwater Monitoring: Quarterly <br /> Is Free Product (FP) Present Onsite: No <br /> FP Recovered this Quarter: None <br /> Cumulative FP Recovered to Date: 7 gallons <br /> Current Remediation Techniques: Natural Attenuation <br /> Approximate Depth to Groundwater: 14.32 to 31.60 feet below ground surface (bgs) <br /> Groundwater Flow and Gradient: East-Northeast @ 0.004 feet/foot (ft/ft) <br /> ANALYTICAL DATA REVIEW: <br /> Please note that as of April 1, 2004, the laboratory has changed the carbon range for gasoline range organics(GRO) <br /> from C6 — C10 to C4 — C12 (to include the oxygenates). The resulting data may be impacted by the potential <br /> inclusion of additional total petroleum hydrocarbons as gasoline (TPHg) and non-TPHg analytes within the revised <br /> carbon range, which may result in a higher reported concentration. Where the resulting GRO concentration is based <br /> on a single <br /> gle analyte(i.e.,a non-TPHg analyte or a single TPHg analyte),the analyte will be identified if possible. <br /> • <br /> &%WpmocesM BP ARCQW5481Quana1yU QTR 04\548 GWMR 2QWAoc Page 1 <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.