Laserfiche WebLink
• HAMMER LANE <br /> ORiVEWAY DRIVEWAY <br /> i <br /> A <br /> o=�•— SIGN POST <br /> PUMP ISLAND Q <br /> MWS <br /> <50 l <br /> <0.5 J <br /> <0.5 <br /> In <br /> I k+ir— TELEPHONE <br /> (tl—` BOOTHS PUMP ISLAND VW-4 <br /> tr50 <br /> � <br /> <0.5 <br /> 0.88 D <br /> AC PAVING <br /> MW-2 <br /> �50 <br /> SALES <br /> 1.7 d <br /> BUILDING <br /> VW-2 a <br /> e c100 <br /> 1.0 <br /> L-1-0 <br /> TS i—.1 I 0 MW-1 <br /> CONCRETE I <br /> L<10,30I <br /> t � <br /> ri Ta <br /> <50 1.400 D <br /> a <as 7.0 ® z <br /> t <br /> i <0.5 <5.0 AS AAS-1 <br /> } . <br /> VW-1 n <br /> AS3 <br /> <100 <br /> VW-3 <1.0'0 <br /> J <br /> Myry.q 0[1,300] 30 MW5 <br /> T7E I c50 20 r 050 <br /> i!�<OS 3.6 I <05 <br /> <0.5 <br /> SVE SYSTEM COMPOUND MW- <br /> <50 <br /> <015 <br /> 10 <br /> <0.5 <br /> LEGEND <br /> LL <br /> MW-1 MONITORING WELL LOCATION <br /> a <br /> Q <br /> VW-1 VAPOR EXTRACTION WELL LOCATION <br /> ® AS-1 AIR SPARGE LOCATION <br /> • SB-1 SOIL BORING LOCATION N <br /> g r<50 I TPH AS GASOLINE CONCENTRATION IN MICROGRAMS PER LITER(ug1L) O 30 <br /> R IIL<0.5 BENZENE CONCENTRATION IN ugll <br /> m <2.0 MIBE CONCENTRATION IN ug1L <br /> � SAMPLES COLLECTED ON 3!32003 <br /> Scale in Feet <br /> • a GROUNDWATER ANALYTICAL SUMMARY FIGURE <br /> 2520 Venture Oaks Way,Ste.250 2 <br /> Sacramento,CA 95033-3200 ARCO Facility No.546 ARCO Quarterly Groundwater <br /> g TEL:(916)679-20DO 1612 Hammer Lane Monitoring Report-1 st Quarter 2003 <br /> $ FAX:(916)920-7263 Stockton,Caiifomia <br /> a <br /> m <br />