My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0003008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1612
>
3500 - Local Oversight Program
>
PR0545246
>
ARCHIVED REPORTS_XR0003008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 7:29:30 PM
Creation date
1/30/2020 3:29:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0003008
RECORD_ID
PR0545246
PE
3528
FACILITY_ID
FA0003611
FACILITY_NAME
PARKWOODS GAS & FOOD
STREET_NUMBER
1612
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
07728002
CURRENT_STATUS
02
SITE_LOCATION
1612 W HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> w ti <br /> Date November 19, 1999 <br /> ARCO QUARTERLY GROUNDWATER MONITORING REPORT <br /> Facility No 00548 Address 1612 Hammer Lane, Stockton, California <br /> ARCO Environmental Engineer Chuck Carmel <br /> Consulting Co/Contact Person Pinnacle/Mark Capps <br /> Consultant Project No 791687 01000000 <br /> Primary Agency/Regulatory ID No Lon Duncan, San Joaquin County Public Health Services <br /> WORK PERFORMED THIS QUARTER (Third 1999) <br /> 1 Groundwater samples were collected from monitoring wells MW-1 through MW-6 for laboratory <br /> analysis <br /> 2 Pinnacle compiled and evaluated groundwater monitoring data <br /> WORK PROPOSED FOR NEXT QUARTER (Fourth 1999) <br /> . 1 Pinnacle will continue to perform quarterly groundwater monitoring for ARCO The next sampling <br /> event is tentatively scheduled for December 1999 Monitoring wells MW-1 through MW-6 will be <br /> sampled and analyzed for total petroleum hydrocarbons as gasoline using USEPA Method 8015 <br /> modified, and for benzene, toluene, ethylbenzene, and total xylenes, and methyl tert-butyl ether <br /> (MTBE) using USEPA Method 8020 <br /> 2 Upon PG&E electrical installation, system start-up will occur <br /> Current Phase of Project Monitoring/Remediation <br /> Frequency of Groundwater Sampling Wells MW-1 through MW-6- Quarterly <br /> Frequency of Groundwater Monitoring Quarterly <br /> Sampling Date September 10, 1999 <br /> Is Free Product (FP) Present on Site No <br /> FP recovered this Quarter NA <br /> Cumulative FP Recovered to Date NA <br /> Approximate Depth to Groundwater 27 62 to 29 54 <br /> Direction of Groundwater Flow East <br /> Groundwater Gradient 0 004 ft/ft <br /> CP1C1Archrve\Arco105481QtrlyN0548Q399 DOC-9811sg 1 T'(�t6tGtC�C <br />
The URL can be used to link to this page
Your browser does not support the video tag.