My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0003012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1612
>
3500 - Local Oversight Program
>
PR0545246
>
ARCHIVED REPORTS_XR0003012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 7:58:47 PM
Creation date
1/30/2020 3:33:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0003012
RECORD_ID
PR0545246
PE
3528
FACILITY_ID
FA0003611
FACILITY_NAME
PARKWOODS GAS & FOOD
STREET_NUMBER
1612
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
07728002
CURRENT_STATUS
02
SITE_LOCATION
1612 W HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Date: February 19,2003 <br /> Quarter:4th Quarter,2002 <br /> ARCO QUARTERLY GROUNDWATER MONITORING REPORT <br /> Facility No.: 548 <br /> Address: 1612 Hammer Lane, Stockton, CA <br /> ARCO Environmental Engineer: Paul Supple__ <br /> Consulting Co./Contact Person: URS/Vernon Elarth <br /> Consultant Project No.: 38465879.00436 <br /> Primary Agency/Regulatory ID No.: Lori Duncan, San Joaquin County <br /> WORK PERFORMED THIS QUARTER (Fourth 2002): <br /> 1. Performed quarterly groundwater monitoring and sampling. <br /> 2. Prepared and submitted quarterly groundwater monitoring report. <br /> 3_ Performed operation and maintenance of the SVE and AS systems. <br /> WORK PROPOSED FOR NEXT QUARTER (First 2003): <br /> 1. Perform quarterly groundwater monitoring and sampling. <br /> 2. Prepare and submit quarterly groundwater monitoring report. <br /> 3. Perform operation and maintenance of the SVE and AS systems. <br /> QUARTERLY RESULTS SUMMARY (Fourth 2002): <br /> Current Phase of Project: Remediation <br /> Frequency of Groundwater Sampling: Wells MW-1 through MW-6 and VW-1 through VW-5 <br /> sampled Quarterly <br /> Frequency of Groundwater Monitoring: Quarterix <br /> Is Free Product (FP) Present Onsite: No <br /> FP Recovered this Quarter: None <br /> Cumulative FP Recovered to Date: 7 gallons <br /> Current Remediation Techniques: Soil vapor extraction and air sparging <br /> Approximate Depth to Groundwater: 8.67 to 31.00 ft <br /> Groundwater Flow and Gradient: Northeast @ 0.002 ft/ft <br /> ANALYTICAL DATA REVIEW: <br /> Groundwater samples collected on 12/4/02.- <br /> Based <br /> 2/4/02:Based on the review of the analytical and hardcopy data (chain-of-custody records, blanks,dilutions, holding times, <br /> LCS/LCSD results,MS/MSD results,and surrogate recoveries),the data are acceptable as reported by the laboratory <br /> with the following limitations: <br /> • Samples VW-2,VW-3, VW-4 and VW-5S exceeded the 20 samples per batch QC criteria. Since other <br /> QC requirements were met,the data is acceptable. <br /> • The reported results for the total petroleum hydrocarbons as gasoline(TPHg)in samples VW-1,VW-2, <br /> . VW-3,and VW-4 were due to a high relative percent differrnce(RPD)between the LCS and LCSD. <br /> KN5 se nxco\00549+4 QTR 02`549 cwMR4Qo2_do- Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.