Laserfiche WebLink
HAMMER LANE <br /> DRIVEWAY DRIVEWAY <br /> �I <br /> �-+— SIGN POST <br /> PUMP ISLAND �,p L <br /> M0 <br /> <Q.5 <br /> <0.5 <br /> —TELEPHONE <br /> BOOTHS PUMP ISLAND VW-4 a <br /> d° m <br /> AC PAVING <br /> MW-2 <br /> <5D <br /> SALES <0.5 <br /> 1.6 Qi <br /> BUfLDING <br /> VW-2 <br /> z <br /> O a <br /> T <br /> T5 MW-1 <br /> CONCRETE 400 <br /> • 0.9 <br /> 900 <br /> v" NW- D <br /> TT1 rz 73 T4 <br /> � � n <br /> AS" faAS 1 rM <br /> dvw-i b <br /> AS-3® j <br /> W <br /> MW4 a MWS <br /> 1E <50 <50 <br /> <0.5 <D.5 <br /> <D.5 <0.5 <br /> SVE SYSTEM COMPOUND W-6 <br /> 450 <br /> 1 <br /> LEGEND <br /> to MWA MONITORING WELL LOCATION <br /> o VW-1 VAPOR EXTRACTION WELL LOCATION <br /> ® AS-1 AIR SPARGE LOCATION <br /> • SB-1 SOIL BORING LOCATION N <br /> [<,o <br /> TPH AS GASOLINE CONCENTRATION IN MICROGRAMS PER LITER(uq&) 0 30 <br /> <0.5 BENZENE CONCENTRATION IN ug& I t <br /> iv 52.0 MISE CONCENTRATION IN uglL <br /> z SAMPLES COLLECTED ON 91912002 Scale in Feet <br /> it <br /> I= GROUNDWATER ANALYTICAL SUMMARY FIGURE <br /> 2520 Venture Oaks Way,Ste.250 <br /> Sacramento,CA V-41213-3200 Arco Facility No.548 Arco Quarterly Groundwater <br /> TEL:(946)679-2000 1612 Hammer Lane Monitoring Report-3rd Quarter 2002 <br /> FAX:(916)8Z9 7263 Stockton,California <br /> m <br />