My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0003014
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1612
>
3500 - Local Oversight Program
>
PR0545246
>
ARCHIVED REPORTS_XR0003014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 7:55:47 PM
Creation date
1/30/2020 3:35:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0003014
RECORD_ID
PR0545246
PE
3528
FACILITY_ID
FA0003611
FACILITY_NAME
PARKWOODS GAS & FOOD
STREET_NUMBER
1612
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
07728002
CURRENT_STATUS
02
SITE_LOCATION
1612 W HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> TABLE 4 <br /> OPERATIONAL UPTIME INFORMATION OF THE <br /> • SOIL VAPOR EXTRACTION SYSTEM <br /> Former ARCO Service Station No. 548 <br /> 1612 Hammer Lane, Stockton, California <br /> Date Hr. Meter No. of Days Between Sampling Dates Cumulative Das Percent <br /> Reading Total Das Uptime Das Down Total Das Uptime Uptime <br /> 01/08/02 14,296.0 43 0.1 42.9 467 341.1 0.13% <br /> 01/21/02 14,532.0 13 9.8 3.2 480 351.0 75.64% <br /> 02/04/02 14,873.0 14 14.2 0.0 494 365.2 100% <br /> 02/25/02 15,371.0 21 20.8 0.3 515 385.9 99% <br /> 03/04/02 15,540.0 7 7 0.0 522 393.0 100% <br /> 3118102 4 15,740.0 14 8 5.7 536 401.3 60% <br /> 04/01/02 16,076.0 14 14 0.0 550 415.3 100% <br /> 04/22/02 16,579.0 21 21 0.0 571 436.3 100% <br /> 6/24102 s 17,306.4 63 30 32.7 634 466.6 48% <br /> ' Upon arrival at site system was found to be shut down due to an inoperable blower. <br /> z System was shutdown on arrival, chart recorder indicated system shutdown on 4129/01. <br /> The Blower was removed for re pairlreplacement <br /> 3 System down due to power outage and was not re-started for four weeks <br /> to allow recharge in wells and to monitor for increase in concentration. <br /> 4 System down due to power outage <br /> System shutdown during the month of May for Consultant transition of the site. <br /> Arco_0548_Quarterky_0&M Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.