My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012771
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1612
>
3500 - Local Oversight Program
>
PR0545246
>
ARCHIVED REPORTS_XR0012771
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 7:56:02 PM
Creation date
1/30/2020 3:40:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012771
RECORD_ID
PR0545246
PE
3528
FACILITY_ID
FA0003611
FACILITY_NAME
PARKWOODS GAS & FOOD
STREET_NUMBER
1612
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
07728002
CURRENT_STATUS
02
SITE_LOCATION
1612 W HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
q 7 <br />. Date March 12, 1997 <br /> ARCO QUARTERLY GROUNDWATER MONITORING REPORT <br /> Facildy No 00548 Address 1612 Hammer Lane, Stockton, California <br /> ARCO Environmental Engineer Paul Supple. <br /> Consulting Co/Contact Person EMCON/Jay R Johnson <br /> Consultant Project No 20805-140 005 <br /> Primary Agency/Regulatory ID No Mary Meas San Joaquin County Public Health Services <br /> WORK PERFORMED THIS QUARTER (Fourth 1996) <br /> 1 Performed quarterly groundwater sampling <br /> 2 Compiled and evaluated groundwater monitoring data <br /> WORK PROPOSED FOR NEXT QUARTER (First 1997) <br /> 1 EMCON will continue to perform quarterly groundwater monitoring for ARCO The next sampling <br /> event is tentatively scheduled for February 1997 <br /> Current Phase of Project Monitoring/Assessment <br /> Frequency of Groundwater Sampling Quarterly <br /> Frequency of Groundwater Monitoring Quarterly <br /> Sampling Date November 20, 1996 <br /> Is Free Product(FP) Present On Site No <br /> FP Recovered this Quarter NA <br /> Cumulative FP Recovered to Date NA <br /> Approximate Depth to Groundwater 34 57 to 36 71 <br /> Direction of Groundwater Flow East <br /> Groundwater Gradient 0 002 <br /> DISCUSSION <br /> Results of this monitoring event indicate that concentrations of dissolved gasoline hydrocarbons are <br /> consistent with those detected during previous sampling events The groundwater flow direction and <br /> gradient were consistent with previous sampling events Groundwater elevation increased approximately <br /> 1 02 feet from the previous sampling event (August 1996) <br />• <br /> SA[1IV\PJM80"8051400 5AH-97\prz 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.