My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012772
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1612
>
3500 - Local Oversight Program
>
PR0545246
>
ARCHIVED REPORTS_XR0012772
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 7:13:17 PM
Creation date
1/30/2020 3:41:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012772
RECORD_ID
PR0545246
PE
3528
FACILITY_ID
FA0003611
FACILITY_NAME
PARKWOODS GAS & FOOD
STREET_NUMBER
1612
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
07728002
CURRENT_STATUS
02
SITE_LOCATION
1612 W HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' Ms Diane Hinson <br /> September 14, 1994 <br /> Page 3 <br /> ' The results of the mass calculations are summarized in the following table <br /> ' ARCO Service Station <br /> PARAMETER No 760 No 548 <br /> Estimated total mass of TPHG calculated, 489 383 <br /> pounds <br /> ' The calculated hydrocarbon mass beneath each site is only an estimate for comparison purposes <br /> only <br />' GROUNDWATER FLOW DIRECTION AND GRADIENT <br /> The groundwater gradient and flow direction of the first encountered groundwater beneath each <br /> site was reviewed to evaluate if one of the sites exhibits a greater potential for plume migration <br /> 1 <br /> ARCO No 760 <br />' Agroundwater monitoring program was initiated at the <br /> ARCO Lodi site in the first quarter of <br />' 1994, therefore, only two quarters of data were available for review Between March and June, <br /> 1994 the groundwater flow direction has changed approximatelY 20 degrge , from south-southeast <br /> to east-northeast The gradient has ranged from 0 0013 to 0 004 The third quarter groundwater <br />' sampling event is scheduled for the end of Septe e�4— <br /> ARCO No 548 <br />' A groundwater monitoring program was initiated at the ARCO Stockton site in the fourth quarter <br /> of 1991 The groundwater flow direction has been consistently towards the east-southeast with <br />' gradient ranging from 0 002 to 0 005 (a gradient of 0 01 was recorded in 1992) The third <br /> quarter groundwater sampling event is also scheduled for the end of September 1994 <br />' SOIL PERMEABILITY <br /> The permeability of subsurface materials encountered beneath each site has been evaluated The <br /> evaluation concentrated on subsurface materials which contain the majority of residual <br /> hydrocarbon mass which could leach from the sail and may further impact groundwater <br />
The URL can be used to link to this page
Your browser does not support the video tag.