Laserfiche WebLink
I <br /> Ms Diane Hinson <br /> i <br /> September 14, 1994 <br /> Page 6 <br /> We hope this information provides adequate justification for locating the new vapor extraction <br /> treatment unit at the ARCO Lodi site If you have any questions regarding the evaluation or any <br /> other aspects of the two ARCO sites, please do not hesitate to call <br /> Sincerely, <br /> EMCON Associates <br /> Steven R Touclu ay J son <br /> Chemical Engineer S io oject Supervisor <br /> ' Attachments Figures 1 through 5 Isoconcentration Contour Lines of TPHg <br /> at Various Depths for Station No 760, Lodi <br /> Figures 6 through 10 Isoconcentration Contour Lines of TPHg <br /> at Various Depths for Station No 548, Stockton <br /> Figure 11 Water Supply Well Survey <br /> Appendix A Soil Analytical Results <br /> Appendix B Soil Borings <br /> Appendix C Calculations of Total Mass of TPHg <br /> for ARCO Stations No 760 and No 548 <br /> cc Kyle Christie, ARCO Products Company <br /> Chuck Carmel, ARCO Products Company <br /> I <br /> I <br /> 1 <br />