Laserfiche WebLink
San o . • <br /> Environmental Health ' <br /> Memo t <br /> To: Kent Doty, Mark Thomas and Company, 530 Bercut Drive, Sacramento CA 95814 <br /> From: Mary Meays, Senior RBHS <br /> Date: May 8, 1997 <br /> E Re: Monitoring Well Locations and Owners <br /> The sites and responsible parties which we discussed that may be affected by the proposed Benjamin <br /> Halt and Hammer Lane Interchange projects include: <br /> The Chevron Station is located at 2905 Benjamin;Holt Drive, Stockton CA The Chevron engineer <br /> responsible is Brett Hunter and he can be reached at(510)842-8695 or PO Box 5004 San Ramon CA <br /> 94583-804. The San Joaquin County Environmental Health contact is Mary Meays. <br /> The ARCO Station is located at 2908 Benjamin';Holt Drive, Stockton CA. .The ARCO engineer <br /> responsible is Paul Supple and he can be.reached at (510) 299-8891 or PO Box 6549 Moraga CA <br /> 94570. The San Joaquin County Environmental Health contact is Mary Meays. <br /> The BP Station is located at 3202 West Hammer Lane, Stockton CA. The BP engineer responsible is <br /> Scott Hooten and he can be reached at (206) 251-0667 or Building 13 Suite "N" 295 SW 4111 Street <br /> Renton WA 98055-4931. The San Joaquin County Environmental Health contact is Steve Sasson.. <br /> is <br /> The former site located adjacent to the Benjamin Holt Drive Southland facility was an Exxon station has <br /> } been closed and the monitoring wells destroyed. <br /> I have included copies of maps for the Chevron,ARCO and,BP facilities for your reference. <br /> If you require further information, please do not hesitate to contact me at(209)468-0337• <br /> r . <br /> i <br /> 0 Page 1 <br />