Laserfiche WebLink
3202 West Hammer Lane <br /> Page 2 of 2 <br /> y _ <br /> :A. <br /> • Analyze grab groundwater 'samples for total petroleum <br /> E hydrocarbons as diesel (TPH-d) ,by EPA SW-846 method <br /> 801513 benzene, toluene, ethyl benzene and total xylenes <br /> (BTEX) ; total petroleum hydrocarbons as gasoline (TPH-g) , f <br /> di-isopropyl ether (DIPE) , ethyl tertiary-butyl ether <br /> (ETRE) , methyl tertiary-butyl ether (MTBE) , tertiary-amyl <br /> methyl ether (TAME) , tertiary butyl alcohol .(TBA) , <br /> methanol, ethanol, 1, 2-dichloroetharne (1, 2-DCA) , and 1, 2- <br /> dibromoethane (EDB) by EPA $W-846 method 8260B. <br /> • Report 1, 2-DCA and EDB at 0.5 micrograms per: liter (µg/L) <br /> in grab groundwater samples, if possible. <br /> H <br /> COMMENTS AND CONDITIONS: <br /> S • Obtain the boring permit from the Environmental Health <br /> Department (EHD) . <br /> • Notify EHD at least 12 hour$ prior to' the proposed + <br /> scheduled work date. ;E <br /> • Submit a site-specific health and safety plan to EHD <br /> prior to commencement of .the fieldwork. <br /> • Complete the fieldwork by July 7, 2004 . <br /> • Submit the CPT report to RHD within eight weeks of <br /> completing the fieldwork. <br /> REASONS FOR DISAPPROVAL OF THE WORKPLAN (H&S Section j <br /> 25296.10 (a) (3) ) °. <br /> • None. <br /> DATED: June 1, 2004 BY: <br /> ' I <br /> Victoria L. McCartney, REHS # <br /> C <br /> (209) 468-3456 <br /> Cr_ James L. L. -Barton, CVRWQCB 4 <br /> M. Gavan Oeinrich, Secor . <br /> f <br /> E <br /> i r <br /> f <br />