My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3202
>
3500 - Local Oversight Program
>
PR0545250
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 4:50:48 PM
Creation date
1/30/2020 3:52:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545250
PE
3528
FACILITY_ID
FA0001817
FACILITY_NAME
7-ELEVEN INC #35355
STREET_NUMBER
3202
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95209
CURRENT_STATUS
02
SITE_LOCATION
3202 W Hammer Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
341
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br /> 3202 West Hammer Lane <br /> Page 2 of 2 <br /> • Analyze grab groundwater samples for; total <br /> petroleum <br /> hydrocarbons as diesel (TPH-d) by EPA SW--846 method <br /> 8015B; benzene, toluene, ethyl benzene and total xylenes <br /> (BTEX) ; total petroleum hydrocarbonsas gasoline (TPH-g) , <br /> di-isopropyl ether (DIPE) , ethyl tertiary-butyl ether <br /> (ETBE) , methyl tertiary-butyl ether ',:(MTBE) , tertiary-amyl <br /> methyl ether (TAME) , tertiary butyl alcohol '(TBA) , <br /> methanol, ethanol , 1, 2-dichloroethane (1, 2-DCA) , and 1 , 2- <br /> dibromoethane (EDB) by EPA SW-846 method 8260B. <br /> • Report 1, 2-DCA and EDB at 0 . 5 mi:croglrrams per liter ([ig/L) <br /> in grab groundwater samples, if possible . y <br /> } <br /> COMMENTS AND CONDITIONS: <br /> • Obtain the boring permit from the Environmental Health <br /> Department (EHD) . <br /> • Notify EHD at least 72 hourp prior to the proposed <br /> scheduled work date . <br /> • Submit a site-specific health and safety plan to EHD <br /> prior to commencement of the fieldwork. <br /> r <br /> • Complete the fieldwork by July 7 , 2004 . <br /> • Submit the CPT report to EHD within 'eight weeks of <br /> completing the fieldwork. <br /> REASONS FOR DISAPPROVAL OF THE WORKPLAN (H&S Section <br /> 25296 .10 (c) (3) ) : <br /> + None . <br /> DATED: June 1, 2004 BY: <br /> Victoria L. McCartney, REHS <br /> (209) 468-3456 <br /> Cc : James L. L. Barton, CVRWQCB <br /> M. Gavan Deinrich, Secor <br /> � li <br />
The URL can be used to link to this page
Your browser does not support the video tag.