Laserfiche WebLink
PUBLI Lwet HEALTH SEkoVICES Q ��{ .• <br /> SAN JOAQ'UIN COUNTY <br /> ENVIRONMENTAL HEALTH DIVISION <br /> Karen Furst, M.D.,M.P.H., Health Officer c�•_ <br /> " 304 East Weber'Avenue, Third Floor • Stockton, CA 95202 <br /> ,• A. _ -,. 209/468-3420 <br /> k R <br /> SCOTT HOOTON <br /> BP OIL COMPANY , <br /> 295 SW 41" ST BLDG 13 SUITE N <br /> RENTON WA 98055 <br /> RE: Former BP Oil Site# 11193 <br /> 3202 W.-Hammer Ln:--;: � <br /> Stockton,CA + 6 <br /> WORKPLAN: Work Plan for 5-Da Dual Phase Extraction Event DATED: 10/29/01 <br /> PREPARED BY: SECOR International.Inc. <br /> APPROVED X <br /> DISAPPROVED ❑ <br /> ADDENDUM ❑ Submit by: <br /> ADEQUATE AND NECESSARY ELEMENTS OF THE-WORKPLAN(H&S 25299',37,subd.(c)(3)): <br /> 1. Conduct a 5-day,dual phase extraction(DPE) feasibility test using a trailer-mounted DPE system. <br /> ti <br /> COMMENTS AND CONDITIONS: <br /> 1. DPE system will run continuous 24 hrs.per day for the 5 days. <br /> 2. Effluent extracted groundwater will be sampled at the start-up of the system,once each day and prior to <br /> termination of the test. <br /> 3. Laboratory analysis of vapor and groundwater samples for total petroleum hydrocarbons,BTEY,and fuel <br /> oxygenating compounds. <br /> 4. Notif PHS/EHD at least 48 hours prior to the proposed scheduled work dates. <br /> 5. Please forward copies of all reports to Marty Hartzell at the CVRWQCB <br /> DATED BY <br /> Sa�Savig�S <br /> LOP/Site Mitigation Unit IV <br /> Cc: CVRWQCB—Marty Hartzell <br /> SECOR International,Inc.—Rusty Benkosky <br /> Tosco Corporation—David Camille <br /> VI' ! , c. <br /> NOV 092001 <br /> J� , <br /> A Di is a,o a 1aTu�in Coun Health Care Services 3 <br /> cril f l/SHIM S <br /> f <br />