My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3202
>
3500 - Local Oversight Program
>
PR0545250
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 4:50:48 PM
Creation date
1/30/2020 3:52:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545250
PE
3528
FACILITY_ID
FA0001817
FACILITY_NAME
7-ELEVEN INC #35355
STREET_NUMBER
3202
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95209
CURRENT_STATUS
02
SITE_LOCATION
3202 W Hammer Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
341
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLI Lwet HEALTH SEkoVICES Q ��{ .• <br /> SAN JOAQ'UIN COUNTY <br /> ENVIRONMENTAL HEALTH DIVISION <br /> Karen Furst, M.D.,M.P.H., Health Officer c�•_ <br /> " 304 East Weber'Avenue, Third Floor • Stockton, CA 95202 <br /> ,• A. _ -,. 209/468-3420 <br /> k R <br /> SCOTT HOOTON <br /> BP OIL COMPANY , <br /> 295 SW 41" ST BLDG 13 SUITE N <br /> RENTON WA 98055 <br /> RE: Former BP Oil Site# 11193 <br /> 3202 W.-Hammer Ln:--;: � <br /> Stockton,CA + 6 <br /> WORKPLAN: Work Plan for 5-Da Dual Phase Extraction Event DATED: 10/29/01 <br /> PREPARED BY: SECOR International.Inc. <br /> APPROVED X <br /> DISAPPROVED ❑ <br /> ADDENDUM ❑ Submit by: <br /> ADEQUATE AND NECESSARY ELEMENTS OF THE-WORKPLAN(H&S 25299',37,subd.(c)(3)): <br /> 1. Conduct a 5-day,dual phase extraction(DPE) feasibility test using a trailer-mounted DPE system. <br /> ti <br /> COMMENTS AND CONDITIONS: <br /> 1. DPE system will run continuous 24 hrs.per day for the 5 days. <br /> 2. Effluent extracted groundwater will be sampled at the start-up of the system,once each day and prior to <br /> termination of the test. <br /> 3. Laboratory analysis of vapor and groundwater samples for total petroleum hydrocarbons,BTEY,and fuel <br /> oxygenating compounds. <br /> 4. Notif PHS/EHD at least 48 hours prior to the proposed scheduled work dates. <br /> 5. Please forward copies of all reports to Marty Hartzell at the CVRWQCB <br /> DATED BY <br /> Sa�Savig�S <br /> LOP/Site Mitigation Unit IV <br /> Cc: CVRWQCB—Marty Hartzell <br /> SECOR International,Inc.—Rusty Benkosky <br /> Tosco Corporation—David Camille <br /> VI' ! , c. <br /> NOV 092001 <br /> J� , <br /> A Di is a,o a 1aTu�in Coun Health Care Services 3 <br /> cril f l/SHIM S <br /> f <br />
The URL can be used to link to this page
Your browser does not support the video tag.