My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3202
>
3500 - Local Oversight Program
>
PR0545250
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 4:50:48 PM
Creation date
1/30/2020 3:52:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545250
PE
3528
FACILITY_ID
FA0001817
FACILITY_NAME
7-ELEVEN INC #35355
STREET_NUMBER
3202
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95209
CURRENT_STATUS
02
SITE_LOCATION
3202 W Hammer Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
341
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JUN 2 i 2001 x <br /> BP Oil Company P -2- <br /> f4 . <br /> investigative workplan/Corrective Action Plan (CAP)before performing any work. This phasing process <br /> and the workplan/CAP requirements were intended to: <br /> 1. help the responsible party undertake the necessary corrective action in a cost-effective, efficient and <br /> timely manner; <br /> 2, enable the regulatory agency to review and approve the proposed cost-effective corrective action <br /> alternative before any corrective action work was performed; and <br /> I 3. ensure the Fund will only reimburse the most cost-effective corrective action alternative required by <br /> the regulatory agency to achieve the minimum cleanup necessary to protect human health, safety and <br /> the environment. ' <br /> t In some limited situations interimclea p will be necessaiy to mitigate a demonstrate imme late <br /> hazard to public health, or the environment. Program regulations allow the responsible party to undertake <br /> interim remedial action after: (1)notifying the regulatory agency of the proposed action, and; (2) <br /> complying with any requirements that the regulatory agency may set. Interim remedial action should only <br /> be proposed when necessary to mitigate an immediate demonstrated,hazard.Implementing interim <br /> remedial action does not eliminate the requirement for a CAP and an evaluation of the most cost- <br /> effective corrective action alternative. <br /> Three bids and Cast Prean <br /> nroval: Only corrective action costs required by'the regulatory'agency i6'!` r' r <br /> protect human health,safety and the environment can be claimed for.reimbursement. You must comply <br /> with all regulatory agency time schedules and requirements and you must obtain three bids for any.,! . <br /> required corrective action. Unless waived in writing,you are required to obtain preapproval of costs for <br /> all future corrective action work. If you do not obtain three bids or.a waiver of the three bid <br /> requirement, reimbursement is not assured and costs may be rejected as ineligible. <br /> i{ If you have any questions,please contact me at(916) 341-5681. <br /> Sincerely, <br />` Sandy Gill <br /> Claims Review Unit d <br /> Underground Storage Tank Cleanup Fund. <br /> cc: Mr. Gordon Boggs Ms.Margaret Lagorio <br /> RWQCB, Reg. 5 - Sacramento San Joaquin County ERD <br /> 3443 Routier Road "P.O.Box-2009 <br /> Sacramento, CA 95827-3098 ';=tee° ```Stockton;CA'95201' <br /> F .S•: .'Sl Sr <br /> California En vironmenta/Protection Agency <br /> P.�1 Recycled Paper <br />
The URL can be used to link to this page
Your browser does not support the video tag.