Laserfiche WebLink
SITE SAFETY PLAN l <br /> All field procedures and activities related to the site investigation will be conducted m' <br /> accordance with the site-specific safety plan. The site safety plan'will.be developed in " <br /> ' accordance with applicable requirements of the California Environmental Protection Agency <br /> and the federal and state Occupational Safety and-Health Administration,. ; <br /> IMPLEMENTATION SCHEDULE <br /> The proposed supplemental'site investigation will be"completed and a.report submitted ` <br /> within 75 days after approval of the proposed work plan from the,appropriate regulatory , <br /> agencies. <br /> The estimated schedule for completion of the tasks is,as follows-.- <br /> Days <br /> ollows:Days After Work- <br /> Task/Activity = PlanApproval <br />' Acquire permits • 15 <br /> Install wells 25 <br /> Develop and sample wells 30 <br /> Analyze samples 45.' <br /> Analyze data •60 <br /> Prepare,report 75. <br /> •s <br /> s - <br /> r <br /> 4 j` <br /> .1013601/042793 4 <br /> ALISTO ENGINEERING GROUP - <br /> . <br />