My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3202
>
3500 - Local Oversight Program
>
PR0545250
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 4:42:26 PM
Creation date
1/30/2020 3:54:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545250
PE
3528
FACILITY_ID
FA0001817
FACILITY_NAME
7-ELEVEN INC #35355
STREET_NUMBER
3202
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95209
CURRENT_STATUS
02
SITE_LOCATION
3202 W Hammer Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 4 <br /> A <br /> i <br /> Z MA <br /> October 13, 1992 Working To Restore Nature <br /> BP Oil Facility No. 11193, Stockton, California <br /> The ground water samples collected from the wells will be analyzed for TPHg using EPA <br /> Method 8015 (modified) and BTEX using EPA Method 602. Detection limits for the tests <br /> requested and concentrations present will be stated on the laboratory reports. Analytical methods <br /> and detection limits will conform to guidelines specified in the latest edition of the Tri-Regional <br /> Recommendations of the RWQCB. Laboratory analyses will be performed by a laboratory <br /> certified by the State of California. <br /> REPORT PREPARATION <br /> A report summarizing methodology, the soil stratigraphy in the borings, and field and laboratory <br /> results will be supplied to BP Oil. Information gathered during the investigation will be <br /> considered confidential and will be released only with the authorization of BP Oil. <br /> PROJECT SCHEDULE <br /> RESNA is prepared to begin work on this project immediately in accordance with the work plan <br /> approval by BP Oil and the appropriate agencies. <br /> We recommend signed copies of this work plan be forwarded to Ms. Margaret Lagorio, San <br /> Joaquin Public Health Services, 445 North San Joaquin, Stockton, California, 95201, (209) 468- <br /> 3449. <br /> Please call if you have questions or comments regarding this work plan. <br /> Sincerely, <br /> _ SeD G60,o RESNA Industries Inc. <br /> \g er,%LEY e0 C- <br /> C> <br /> C 0� <br /> * # Keith A. Romstad <br /> No. 4313 Project Manager <br /> �l4TF OF CAS\E���\p <br /> John B. Bobbitt <br /> R.G. 4313 <br /> Attachments: Site Vicinity Map (Plate 1) <br /> Generalized Site Plan (Plate 2) <br /> Typical Well Construction Diagram (Plate 3) <br /> Site Safety Plan <br /> Site Mitigation Acknowledgement/Request for Services Form <br /> Request for Priority Review Form <br /> Monitoring Well Permit Application <br /> 17051.01w 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.