My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3202
>
3500 - Local Oversight Program
>
PR0545250
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 4:42:26 PM
Creation date
1/30/2020 3:54:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545250
PE
3528
FACILITY_ID
FA0001817
FACILITY_NAME
7-ELEVEN INC #35355
STREET_NUMBER
3202
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95209
CURRENT_STATUS
02
SITE_LOCATION
3202 W Hammer Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT C <br /> SECOR INTERNATIONAL INCORPORATED <br /> FIELD AND LABORATORY PROCEDURES <br /> STANDARD PROCEDURE FOR <br /> HOLLOW STEM AUGER DRILLING <br /> Prior to drilling, all boring locations are marked with white paint or other discernible marking and <br /> cleared for underground utilities through Underground Service Alert(USA). In addition,the first <br /> five feet of each borehole are drilled with a hand auger or posthole digger to evaluate the <br /> presence of underground structures or utilities. <br /> Once predrilling efforts to identify subsurface structures are complete, precleaned hollow stem <br /> augers(typically 8 to 10 inches in diameter)are advanced using a rotary drill rig for the purpose <br /> of collecting samples and evaluating subsurface conditions. Upon completion of drilling and <br /> sampling the augers are retracted and the borehole is filled with concrete, bentonite grout, <br /> hydrated bentonite chips or pellets as required by the regulatory agency. In areas where the <br /> borehole penetrates asphalt or concrete,the borehole is capped with an equivalent thickness of <br /> asphalt or concrete patch to match finish grade. <br /> During the drilling process a physical description of the encountered soil characteristics (i.e. <br /> moisture content, consistency, odor,'color, etc.), drilling difficulty and soil type as a function of <br /> depth are described on boring logs. The soil cuttings are classified in accordance with the <br /> USCS. <br /> All soil cuttings are temporarily stored on-site in 55-gallon DOT approved drums pending <br /> laboratory analysis, waste profiling and proper disposal. A label is affixed to the drums <br /> indicating the contents of the drum, suspected contaminants, date of drilling, borehole number, <br /> and depth interval from which the contents were generated. <br /> Related Procedures: <br /> • Standard Procedure for Soil Sampling—Split Spoon Sampling <br /> • Standard Procedure for Equipment Decontamination <br /> STANDARD PROCEDURE FOR <br /> EQUIPMENT DECONTAMINATION <br /> All equipment that could potentially contact subsurface media and compromise the integrity of <br /> the samples is carefully decontaminated prior to drilling and sampling. Drill augers and other <br /> large pieces of equipment are decontaminated using high pressure hot water spray. Samplers, <br />
The URL can be used to link to this page
Your browser does not support the video tag.