My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3202
>
3500 - Local Oversight Program
>
PR0545250
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 4:42:26 PM
Creation date
1/30/2020 3:54:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545250
PE
3528
FACILITY_ID
FA0001817
FACILITY_NAME
7-ELEVEN INC #35355
STREET_NUMBER
3202
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95209
CURRENT_STATUS
02
SITE_LOCATION
3202 W Hammer Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S E C 0 R <br /> Ms. Vicky McCartney <br /> March 29, 2004 <br /> Page 6 <br /> Report. Following the completion of the CPT/HydroPunch@ assessment, <br /> SECOR will submit a report documenting the findings of the investigation. The <br /> report will include soil boring logs, seil--an"roundwater analytical results, chain- <br /> of-custody documentation, conclusions, and recommendations for installation of <br /> permanent deeper-zone monitoring wells, if warranted. <br /> SCHEDULE <br /> SECOR is prepared to initiate the coordination of fieldwork activities immediately following the <br /> approval of this addendum work plan. If petroleum hydrocarbon and/or fuel oxygenate impacts are <br /> observed in groundwater analytical results from the CPT/HydroPunch® assessment the need to <br /> install permanent deeper-zone monitoring wells will be evaluated by SECOR and the SJCEHD. A <br /> report documenting the findings of on-site vertical assessment activities will be submitted <br /> approximately six to eight weeks after the completion of fieldwork activities and upon receipt of <br /> laboratory analytical data. If deeper zone monitoring wells are necessary, the final report will include <br /> a work plan for deeper-zone monitoring well installation. <br /> If there are any questions regarding the contents of this work plan, please contact the undersigned at <br /> (916) 861-0400. <br /> Sincerely, <br /> SECOR International Incorporated <br /> ar At GAvw++�wucN <br /> M. Gavan Heinrich, R.G. No 7572 <br /> Associate Geologist 7 may,, � • <br /> CAL1F0�� <br /> Attachments: Figure 1 —Site Map with Proposed CPT/HydroPunch®Locations <br /> Attachment 1 --SJCEHD Letter Dated December 23, 2003 <br /> Attachment 2—Field and Laboratory Procedures <br /> cc: Ms. Liz Sewell, ConocoPhillips <br /> Kyle Christie, British Petroleum, 6 Centerpoint Drive, first floor, La Palma, CA 90623-1066 <br /> Paul Supple, British Petroleum <br /> Mr. James L.L. Barton, Central Valley Regional Water Quality Control Board <br /> I:1ConocoPhi11ips1111931Work Plans\IRAP&Off-Site Asmt WP Addendum v 2.doc SECOR lntemationa!incorporated <br />
The URL can be used to link to this page
Your browser does not support the video tag.