My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3202
>
3500 - Local Oversight Program
>
PR0545250
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 4:42:26 PM
Creation date
1/30/2020 3:54:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545250
PE
3528
FACILITY_ID
FA0001817
FACILITY_NAME
7-ELEVEN INC #35355
STREET_NUMBER
3202
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95209
CURRENT_STATUS
02
SITE_LOCATION
3202 W Hammer Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECOR <br /> HEALTH AND SAFETY PLAN <br /> REVIEW AND APPROVAL <br /> CLIENT: ConocoPhillips and BP SITE NAME: 76 Service Station#11193 <br /> PROJECT NAME:_Cone Penetrometer Testing(CPT)_ PROJECT NUMBER: 77CP.60193.04.0003 <br /> 77BP.50193.02.0946 <br /> START DATE: Jul 13 20Q4 END DATE: August 2004 <br /> PLAN EXPIRATION DATE: September 2004 <br /> (Last day of expected fieldwork or no longer than 6 months). <br /> Gavan Heinrich Signature: Date:Date: (3 <br /> Project Manager <br /> Todd Brown Signature: Date: :7,66 <br /> SECOR Office Health and Safety Coordinator <br /> Brice Hendricks7 / <br /> Signature: � 1 Date: ! 3 <br /> Site Health and Safety Officer / <br /> Rusty Benkosk Signature: Date: <br /> Business Unit Leader <br /> M a Russell Signature: Date: <br /> Peer Reviewer <br /> This Health and Safety Plan has been written for the use of SECOR and its employees. It may also be used as a guidance document by properly trained <br /> and experienced SECOR subcontractors and clients. <br /> i <br /> Our work can be hazardous, and it is imperative that we never forget that! It is the intent of this document to address our risks. The health and safety <br /> guidelines in this Plan were prepared specifically for this site, its conditions, purposes, dates and personnel and must be amended if conditions change. <br /> This Plan must not be used on any other site without prior research by trained health and safety specialists. <br /> SECOR claims no responsibility for its use by others for purposes unrelated to this project. This Plan will provide useful information to subcontractors <br /> and will assist them in developing their own HASP. Subcontractors should sign this plan (See Attachment 7) as an acknowledgement of hazard <br /> ConocoPhillips SECOR International Incorporated <br /> SECOR Project No, 77BP.50193.00 and 77CP.60193.00 I:IConocoPhillipsUosco Marketing\111931HASPAI1193 HASP CPT Drilling.doc <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.