My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3202
>
3500 - Local Oversight Program
>
PR0545250
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 4:42:26 PM
Creation date
1/30/2020 3:54:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545250
PE
3528
FACILITY_ID
FA0001817
FACILITY_NAME
7-ELEVEN INC #35355
STREET_NUMBER
3202
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95209
CURRENT_STATUS
02
SITE_LOCATION
3202 W Hammer Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL HEALTH DEPARTMENT <br /> SAN JOAQUIN COUNTY <br /> Unit Su <br /> Donna K.Heran,R.E.H.S. Supervisors <br /> Director 304 East Weber Avenue, Third Floor Carl Borgman,R.E.H.S, <br /> Al Olsen,R.'E.H.S. Stockton, California 95202-2708 Mike Huggins,R.E.H.S.,R.D.I. <br /> • ��.. <br /> Program Manager Douglas W.Wilson,R.E.H.S. <br /> Ll�oR�� Laurie A.Cotulla,R.E.H.S. Telephone: (209) 468-3420 Margaret Lagorio,R.E.H.S. <br /> Program Manager Fax: (209) 464-01.38 Robert McClellon,R.E.H.S. <br /> Mark Barcellos,R.E.H.S. <br /> LIZ SEWELL Py DEC 2 3 2003 <br /> CONOCOPHILLIPS <br /> 76 BROADWAY ���.••JJJ <br /> SACRAMENTO CA 95818 <br /> RE: 76 Service Station No. 11193 <br /> 3202 West Hammer Lane 2003 <br /> Stockton, CA <br /> a_- <br /> San Joaquin County Environmental Health Department (EHD) has reviewed Revised <br /> Interim Remedial Action Plan and Work Plan for Ozone Sparge Well Installation and <br /> Additional Off-Site Assessment, dated 15 September 2003, which was submitted on your <br /> behalf by Secor International Incorporated (Secor). An ozone sparging (OS) system will <br /> be installed using ten OS wells (OS-1 through OS-10), completed at a depth of 30 feet <br /> below ground surface (bgs). In addition, two shallow groundwater-monitoring wells <br /> (MW-11, and MWA2)will be advanced to 30 bgs using 8-inch diameter hollow-stem auger <br /> drilling equipment, and soil samples will be collected at 5-foot intervals for lithological <br /> description from ground surface to the total completion depth in each of the borings for the <br /> OS and groundwater monitoring wells. At least three selected soil samples will be <br /> analyzed for total petroleum hydrocarbons as.gasoline (TPHg), benzene, toluene, ethyl <br /> benzene, total xylenes (BTEX), and methyl tertiary-butyl ether (MTBE). In addition to <br /> these analyses, EHD requests that soil samples be analyzed for tertiary butyl alcohol <br /> (TBA), di-isopropyl ether (DIPS), ethyl tertiary butyl ether (ETBE), tertiary amyl methyl <br /> ether (TAME), 1,24chloroethane (1,2-DCA), . 1,2-dibromoethane (EDB), and total <br /> petroleum hydrocarbons as diesel (TPHd). 1,2-DCA should be reported at <br /> 0.5 micrograms per liter (pg/L), if possible, in future groundwater samples collected at this <br /> site. <br /> t EHD approves the work plan as submitted for installation of an OS system to replace the <br /> interim groundwater batch-extraction migration control program, and installation of two <br /> monitoring wells down gradient of MW-6 to further define the dissolved petroleum <br /> hydrocarbon contamination. EHD recommends continuous coring of the borings <br /> advanced for installation of the groundwater monitoring wells to better characterize the <br /> sand occurrences and to ensure that the monitoring objectives are met. A deeper well <br /> may be necessary adjacent to or down gradient of MW-6, based on collected data. <br /> Further investigation of contamination Jin groundwater will be necessary to assess the <br /> vertical extent of impacted groundwater at this site. Please submit a work plan to address <br /> vertical extent of contamination et this site by 4 June 2004. <br /> r <br /> i <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.