My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3202
>
3500 - Local Oversight Program
>
PR0545250
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 4:42:26 PM
Creation date
1/30/2020 3:54:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545250
PE
3528
FACILITY_ID
FA0001817
FACILITY_NAME
7-ELEVEN INC #35355
STREET_NUMBER
3202
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95209
CURRENT_STATUS
02
SITE_LOCATION
3202 W Hammer Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Figure 5 <br /> TPHg, Benzene, and MtBE Concentrations During Interim Groundwater Batch Extraction <br /> Well VW-1 <br /> Tosco (Former BP) Station No. 11193 <br /> 3202 West Hammer Lane <br /> Stockton, California <br /> 500,000 <br /> `/ - --- goo <br /> 450,000 <br /> 600 <br /> 400,000 <br /> m <br /> 350,000 500 = <br /> C o1 <br /> 0 <br /> b 300,000 c <br /> c 400 w <br /> u <br /> V 250,000 <br /> U <br /> W <br /> C <br /> 200,000 300 �j <br /> w <br /> � c <br /> 150,000 y <br /> c <br /> X 200 m <br /> 100.000 <br /> 100 + <br /> 50,000 TPH- � _ 9 <br /> MtBE <br /> 0 0 <br /> --w-Benzene <br /> 2/9/1999 8/28/1999 3/15/2000 10/1/2000 4/19/2001 11/5/2001 5/24/2002 12/10/2002 6/28/2003 1/14/2004 <br /> Date <br /> I:\Projeci—)nocoPhilllpa\Tosco Marketing\11193\Tables\RevIRAP&WPTbls&Figs\Flgure 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.