My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3202
>
3500 - Local Oversight Program
>
PR0545250
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 4:42:26 PM
Creation date
1/30/2020 3:54:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545250
PE
3528
FACILITY_ID
FA0001817
FACILITY_NAME
7-ELEVEN INC #35355
STREET_NUMBER
3202
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95209
CURRENT_STATUS
02
SITE_LOCATION
3202 W Hammer Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GETTLER-RYAN INC. <br /> FIELD METHODS AND PROCEDURES <br /> Site Safety Plan <br /> Field work performed by Gettler-Ryan Inc. (GR) is conducted in accordance with GR's Health and Safety Plan and <br /> the Site Safety Plan. GR personnel and subcontractors who perform work at the site are briefed on the of these <br /> plans contents prior to initiating site work. The GR geologist or engineer at the site when the work is performed <br /> acts as the Site Safety Officer. GR utilizes a photoionization detector(PID)to monitor ambient conditions as part <br /> of the Health and Safety Plan. <br /> Collection of Soil Samples <br /> Exploratory soil borings are drilled by a California-licensed well driller. A GR geologist is present to observe the <br /> drilling, collect soil samples for description, physical testing, and chemical analysis, and prepare a log of the <br /> exploratory soil boring. Soil samples are collected from the exploratory soil boring with a split-barrel sampler or <br /> other appropriate sampling device fitted with clean brass or stainless steel liners. The sampling device is driven <br /> approximately 18 inches with a 140-pound hammer falling 30 inches. The number of blows required to advance <br /> the sampler each successive 6 inches is recorded on the boring log. The encountered soil is described using the <br /> Unified Soil Classification System(ASTM 2488-84)and the Munsell Soil Color Chart. <br /> After removal from the sampling device, soil samples for chemical analysis are covered on both ends with teflon <br /> sheeting or aluminum foil, capped, labeled, and placed in a cooler with blue ice for preservation. A chain-of- <br /> custody form is initiated in the field and accompanies the selected soil samples to the analytical laboratory. <br /> Samples are selected for chemical analysis based on: <br /> a. depth relative to underground storage tanks and existing ground surface <br /> b. depth relative to known or suspected groundwater <br /> C. presence or absence of contaminant migration pathways <br /> d. presence or absence of discoloration or staining <br /> C. presence or absence of obvious gasoline hydrocarbon odors <br /> f. presence or absence of organic vapors detected by headspace analysis <br /> Field Screening of Soil Samples <br /> A PID is used to perform head-space analysis in the field for the presence of organic vapors from the soil sample. <br /> This test procedure involves removing some soil from one of the sample tubes not retained for chemical analysis <br /> and immediately covering the end of the tube with a plastic cap. The PID probe is inserted into the headspace <br /> inside the tube through a hole in the plastic cap. Head-space screening results are recorded on the boring log. <br /> Head-space screening procedures are performed and results recorded as reconnaissance data. GR does not consider <br /> field screening techniques to be verification of the presence or absence of hydrocarbons. <br /> Stockpile Sampling <br /> Stockpile samples consist of four individual sample liners collected from each 100 cubic yards (yd3) of stockpiled <br /> soil material. Four arbitrary points on the stockpiled material are chosen, and discrete soil sample is collected at <br /> each of these points. Each discrete stockpile sample is collected by removing the upper 3 to 6 inches of soil, and <br /> then driving the stainless steel or brass tube into the stockpiled material with a wooden mallet or hand driven soil <br /> sampling device. The sample tubes are then covered on both ends with teflon sheeting or aluminum foil, capped, <br />
The URL can be used to link to this page
Your browser does not support the video tag.