My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3202
>
3500 - Local Oversight Program
>
PR0545250
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 4:42:26 PM
Creation date
1/30/2020 3:54:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545250
PE
3528
FACILITY_ID
FA0001817
FACILITY_NAME
7-ELEVEN INC #35355
STREET_NUMBER
3202
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95209
CURRENT_STATUS
02
SITE_LOCATION
3202 W Hammer Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EMCON - Sacramento TEL :916-928-3333 rvuv a 1�ti - <br /> CnI:N R'r <br /> I' <br /> e e fAi 3' <br /> 9. Appropriate work areas designated(for sopport contaminant: <br /> on will be maintained. <br /> exclusion I CerNIYtNYeR r ", <br /> 10. EMCON Associates on-site persor4d are to be thoroughly <br /> anticipated hazards, equipment turements, safely practices. <br /> Wk <br /> procedures and communications meth �dg,initially and in daily briefing Iw <br /> 11. steel-toes vinyl boots will be worn on�aita at all times. <br /> Fa a� N <br /> j <br /> 12. A multipurpose portable fire extinguisher shall be located on the drilling <br /> 13. All operations personnel will,when possible,locate the drilling oggl . <br /> es so that they will maintain upwind position. <br /> themselvr <br /> acd fol' <br /> 14. Drilling shah not be conducted at any location until the area Prop° <br /> has been cleared by a utility locator firm to be free of buried obstntctibh't _ <br /> power lines,gas lines,etc. <br /> Mir <br /> 19 <br /> for DO R Clpprt R04 <br /> Safety Pracflces <br /> .;"�'•.;.,�:;.:,;M gip:: <br /> In addition,the following precautions shall be adherM to by the drill rig aperatx+r Mix <br /> 1. Before raising the drill rig mast in the vicinity of electrical'pov3e } <br /> operator shall walk completely aron the drill rig to determine the ells <br /> rig to the nearest power line when th mast is being raised(should'bti ;,., . <br /> 2i?fuel). Any questions regarding thq;appropriateness of a drAlirr6,.. <br /> be brought to the attention of the On-site Safety Coordinator. <br /> r. <br /> 2. Before drilling, the location muse be adequately cleaned <br /> aocommodate the drill rig. s + <br /> 3. Housekeeping: Suitable storage 0 all tools, materials and strpplioe< �i ` e�m <br /> provided. Pipe,drill rods,casings,a and similar drilling tools;t <br /> in an orderly manner to preventrolligspreading or sliding. <br /> 4, Work areas and drilling platforms s*be kept free of materi a <br /> substances that could cause a surface N become slick or otherwise haltatdC,4l �. <br /> 1� N '.wry Yp <br /> ada�boiloiltaatifloba TT5��• Rdl itt7Y�1 . <br /> TM <br /> �. OO .... <br /> sM"� r%rANN�MO'M1t lel,:.: X "+0114 IMN MFNM�M,N yh•... .Y Mq l <br />
The URL can be used to link to this page
Your browser does not support the video tag.