My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002928
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3202
>
3500 - Local Oversight Program
>
PR0545250
>
ARCHIVED REPORTS_XR0002928
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 5:27:43 PM
Creation date
1/30/2020 3:57:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002928
RECORD_ID
PR0545250
PE
3528
FACILITY_ID
FA0001817
FACILITY_NAME
7-ELEVEN INC #35355
STREET_NUMBER
3202
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95209
CURRENT_STATUS
02
SITE_LOCATION
3202 W Hammer Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 3202 West Hammer Lane <br /> Page 2 of 2 �> 74 <br /> • Analyze grab groundwater samples for total petroleum <br /> hydrocarbons as diesel (TPH-d) by EPA SW-846 method <br /> 8015B; benzene, toluene, ethyl benzene and total xylenes <br /> (BTEX) ; total petroleum hydrocarbons as gasoline (TPH-g) , <br /> di-isopropyl ether (DIPS) , ethyl tertiary-butyl ether <br /> (ETBE) , methyl tertiary-butyl ether (MTBE) , tertiary-amyl <br /> methyl ether (TAME) , tertiary butyl alcohol (TBA) , <br /> methanol, ethanol, 1,2-dichloroethane (1, 2-DCA) , and 1,2- <br /> dibromoethane (EDB) by EPA SW-846 method 8260B. <br /> • Report 1, 2-DCA and EDB at 0 .5 micrograms per liter (µg/L) <br /> in grab groundwater samples, if possible. <br /> COMXENTS AND CONDITIONS: <br /> • obtain the boring permit from the Environmental Health <br /> Department (EHD) <br /> • • Notify EHD at least 12 hours prior to the proposed <br /> scheduled work date. <br /> • Submit a site-specific health and safety plan to EHD <br /> prior to commencement of the fieldwork <br /> • Complete the fieldwork by July 7, 2004 <br /> • Submit the CPT report to EHD within eight weeks of <br /> completing the fieldwork. <br /> REASONS FOR DISAPPROVAL OF THE WORKPLAN (H&S Section <br /> 25296 .11) (c) (3) ) : <br /> • None. <br /> DATED: June 1, 2004 BY: T! 00,, <br /> Victoria L McCartney, REHS <br /> (209) 4683456 <br /> Cc: James L L Barton, CVRWQCB <br /> M. Gavan Deinrich, Secor <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.