Laserfiche WebLink
S E C O R <br /> Quarterly Remedial Performance Summary <br /> July 28, 2004 <br /> Page 2 <br /> If you have any questions, please contact us at(916) 861-0400 <br /> Sincerely, <br /> SECOR International Incorporated <br /> Annalisa Garcia for Amy Draffan <br /> Staff Engineer * IkC0mmm <br /> L1p i�i1Cl� <br /> Rusty E Benkosky, P OP CAV <br /> Senior Engineer <br /> Attachments Figure 1 —Site Plan <br /> Figure 2—VW-1 TPHg, Benzene, and MtBE Groundwater Concentrations <br /> Figure 3—MW-2R TPHg, Benzene, and MtBE Groundwater Concentrations <br /> . Table 1 --Ozone Injection System Operating Data <br /> Table 2—Ozone Injection System Groundwater Monitoring Data <br /> Attachment A— Field Data Sheets <br /> Attachment B—Certified Analytical Reports and Chain of Custody Documentation <br /> cc Ms Vicki McCartney, San Joaquin County Environmental Health Department <br /> Mr James Barton, RWQCB—Central Valley Regional Water Quality Control Board <br /> Mr Paul Supple, BP <br /> RB/ad <br /> • <br /> 11ConocophilhpslTosco Marketing1111931ReportslQRPS111193 2004 QRPS doe SECOR Intemahonal Incorporated <br />