Laserfiche WebLink
i's <br /> S E C 0 R <br /> 3017 Kilgore Road Suite 100 <br /> Rancho Cordova CA 95670 <br /> . 918-861-0400 TEL s <br /> 918-861-0430 FAX <br /> TPHg at 2,100 ppm (TD-2), toluene at 3 5 ppm (TD-3), ethylbenzene at 18 ppm (TD-3), and total <br /> xylenes at 110 ppm (TD-3) TPHd, oil range total petroleum hydrocarbons (TPH-O), and <br /> benzene were not detected above laboratory detection limits Laboratory analysis of soil samples <br /> from borings THP 1 and THP-2 detected maximum concentrations of TPHd at 1 ppm (THP1S- <br /> 10) and benzene at 0 03 ppm (THP@S-15) TPHg, TPH O, toluene, ethylbenzene, and total <br /> xylenes were not detected above laboratory detection limits Laboratory analysis of groundwater <br /> samples from borings THP-1 and THP-2 detected maximum concentrations of TPHg at 6,900 ppb <br /> (THP2W-21), TPHd at 840 ppb (THP2W-21), benzene at 1,900 ppb (THP2W-21), and total <br /> xylenes at 77 ppb(THP2W-21) TPH-O, benzene toluene, ethylbenzene, and Halogenated <br /> Volatile Organic Compounds (HVOC's) were not detected above laboratory detection limits <br /> (EMCON, 1994) <br /> On December 10 through 22, 1998, Gettler-Ryan Incorporated (GR) supervised the removal of <br /> two 10,000 gallon and one 8,000 gallon single-walled UST, dispensers, and associated product <br /> dispenser piping Laboratory analysis of soil samples collected from the UST excavation <br /> detected maximum concentrations of TPHg at 31 ppm (3W), benzene at 0 27 ppm (3W), and <br /> Methyl-tert Butyl Ether(MtBE) at 80 ppm (3E) Laboratory analysis of soil samples collected from <br /> the beneath the dispensers and product piping detected maximum concentrations of TPHg at <br /> 1,600 ppm (D1) and MtBE at 1 8 ppm (D3) Additionally, approximately 15,000 gallons of water <br /> removed from the UST excavation during the installation of the new USTs Laboratory <br /> analysis of a grab groundwater sample detected maximum concentrations of TPHg, benzene, <br /> and MtBE at 17,000 pg/L, 1,500 pg/L, and 120,000 pg/L, respectively Groundwater monitoring <br /> well MW-1 was destroyed to allow the enlargement of the existing UST excavation to allow for the <br /> installation of the new USTs (GR, 1999) <br /> • On October 7 and 8, 1999, Cambria Environmental Technology, Incorporated (Cambria) <br /> conducted Cone Penetration Testing (CPT) by advancing six borings (CB-1 through CB-6)for soil <br /> and groundwater sampling and two borings (CB-2E and CB-4E) for electric soil logging Sod <br /> samples were collected every five feet to approximately 20 feet bgs Water samples were <br /> collected using a hydropunch at depths of 16 and 29 feet bgs in bo s CB-1, CB-2, and CB4 <br /> through CB-6 Water samples were collected at depths of 16 and feet bgs in boring CB-3 y <br /> Laboratory analysis of soil samples coilected from the soil borings detected maximum <br /> concentrations ofckgasoline range organics (GRO) at 27 milligrams per kilogram (mg/kg) (CB-3- <br /> 13 5), MtBE at 2mg/kg (CB-3-13 5), and Tert amyl methyl ether (TAME) at 0 058 mg/kg (CB-3- <br /> 135) BTEX was not detected above laboratory detection limits Laboratory analysis of <br /> groundwater samples collected from the soil borings detected maximum concentrations of <br /> gasoline range organics (GRO) at 87,000 pg/L (CB4-16HP), benzene at 1,300 pg/L (CB-4- <br /> 16HP), MtBE at 38,000pglL (CB-1-16HP), and TAME at 160 pg/L (CB-1-16HP) (Cambria, 1999) <br /> On June 12 and 13, 2000, Cambria replaced destroyed Well MW-1 and damaged Well MW-2 with <br /> Groundwater Monitoring Wells MW-1 R and MW-2R to depths of 31 5 and 30 feet bgs, <br /> respectively In addition, Cambria drilled and installed two 2-inch diameter wells (MW-9 and MW- <br /> 10) to a total depth of 31 5 feet bgs Laboratory analysis of soil samples collected from the soil <br /> borings detected maximum concentrations of TPHg at 0 82 mglkg (MW8-12') and MtBE at 2 6 H <br /> mg/kg (MW8-30) BTEX was not detected above laboratory detection limits Laboratory analysis <br /> of groundwater samples collected from all wells detected maximum ciiceptrations of TPHg at a <br /> 3,400 pg/L (VW-1), benzene at 84 pg/L (VW-1), MtBE at 250,000 pg/Lf,and Tert-butyl Alcohol <br /> (TBA) at 17,000 pglL (MW-2R) {Cambria, 2000} " <br /> In November 2001, SECOR conducted a five-day dual-phase extraction (DPE) test to reduce the <br /> amount of petroleum hydrocarbons in soil and groundwater beneath the site, and to determine <br /> the feasibility of DPE as an applicable Ethnology for remediation at the site DPE tests were <br /> • performed on well MW-1 R for 3 hours, MW-2R for 3 hours, VW-1 for 2 hours, and simultaneously <br /> ,Y <br />