My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002931
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3202
>
3500 - Local Oversight Program
>
PR0545250
>
ARCHIVED REPORTS_XR0002931
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 5:50:18 PM
Creation date
1/30/2020 4:02:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002931
RECORD_ID
PR0545250
PE
3528
FACILITY_ID
FA0001817
FACILITY_NAME
7-ELEVEN INC #35355
STREET_NUMBER
3202
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95209
CURRENT_STATUS
02
SITE_LOCATION
3202 W Hammer Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S IEC0R <br /> 3017 Kilgore Road Sude 100 <br /> Rancho Cordova CA 95670 ' <br /> • 916-861-0400 TEL Y <br /> 916-081-0430 rnx <br /> March 29, 2004 — Addendum to Revised Remedial Action Work Plan and Work Plan for <br /> Ozone Sparge Well Installation and Additional Off-Site Assessment submitted to San <br /> Joaquin County Environmental Health Division Proposed two cone penetrometer borings and <br /> HydroPunch groundwater sampling to identify deeper water bearing zones and delineate vertical <br /> extent of dissolved contamination <br /> THIS QUARTER ACTIVITIES (First Quarter 2004) <br /> 1 SECOR performed groundwater monitoring and sampling event z <br /> 2 Submitted Addendum work plan for vertical assessment to San Joaquin County <br /> Environmental Health <br /> 3 Installed 10 on-Site remedial (ozone sparge)wells <br /> NEXT QUARTER ACTIVITIES (Second Quarter 2004) <br /> 1 Perform groundwater monitoring and sampling event <br /> 2 Install remedial system conveyance lines and panel System startup and shakedown <br /> 3 Install off-Site monitoring wells <br /> 1 <br /> CONSULTANT SECOR International Incorporated <br /> r� <br /> a <br /> w <br /> ��a <br />
The URL can be used to link to this page
Your browser does not support the video tag.