Laserfiche WebLink
i <br /> S E C 0 R <br /> i } <br /> (THP@S-15) TPHg, TPH-O, toluene, ethyl benzene, and total xylenes were not detected above <br /> laboratory detection limits Laboratory analysis of groundwater samples from borings THP-1 and <br /> THP-2 detected maximum concentrations of TPHg at 6,900 ppb (THP2W-21), TPHd at 840 ppb <br /> (THP2W-21), benzene at 1,900 ppb (THP2W-21), and total xylenes at 77 ppb(THP2W-21) TPH-O, <br /> benzene toluene, ethylbenzene, and Halogenated Volatile Organic Compounds (HVOC's) were not <br /> detected above laboratory detection limits (EMCON, 1994) <br /> On December 10 through 22, 1998, Gettler-Ryan Incorporated (GR) supervised the removal of two <br /> 10,000 gallon and one 8,000 gallon single-walled UST, dispensers, and associated product <br /> dispenser piping Laboratory analysis of soil samples collected from the UST excavation detected <br /> maximum concentrations of TPHg at 31 ppm (3W), benzene at 0 27 ppm (3W), and Methyl-tert Butyl <br /> Ether(MtBE) at 80 ppm (3E) Laboratory analysis of soil samples collected from the beneath the <br /> dispensers and product piping detected maximum concentrations of TPHg at 1,600 ppm (131) and <br /> MtBE at 1 8 ppm (D3) Additionally, approximately 15,000 gallons of water was removed from the <br /> UST excavation during the installation of the new USTs Laboratory analysis of a grab groundwater <br /> sample detected maximum concentrations of TPHg, benzene, and MtBE at 17,000 µg/L, 1,500 µg/L, <br /> and 120,000 gg/L, respectively Groundwater Monitoring Well MW-1 was destroyed to allow the <br /> enlargement of the existing UST excavation to allow for the installation of the new USTs (GR, 1999) <br /> On October 7 and 8, 1999, Cambria Environmental Technology, Incorporated (Cambria) conducted <br /> Cone Penetration Testing (CPT) by advancing six borings (CB-1 through CB-6) for soil and <br /> groundwater sampling and two borings (CB-2E and CB-4E)for electric soil logging Soil samples <br /> were collected every five feet to approximately 20 feet bgs Water samples were collected using a <br /> hydropunch at depths of 16 and 29 feet bgs in borings CB-1, CB-2, and CB-4 through CB-6 Water <br /> samples were collected at depths of 16 and 29 feet bgs in boring CB-3 Laboratory analysis of soil <br /> samples collected from the soil borings detected maximum concentrations of gasoline range <br /> organics (GRO) at 27 milligrams per kilogram (mg/kg) (CB-3-13 5), MtBE at 27 mg/kg (CB-3-13 5), <br /> and Tert amyl methyl ether (TAME) at 0 058 mg/kg (CB-3-13 5) BTEX was not detected above K <br /> laboratory detection limits Laboratory analysis of groundwater samples collected from the soil <br /> borings detected maximum concentrations of gasoline range organics(GRO) at 87,000 Ag/L (CB-4- <br /> 16HP), benzene at 1,300 gg/L (CB-4-16HP), MtBE at 38,000 µg/l_ (CB-1-16HP), and TAME at 160 <br /> gg/L (CB-1-16HP) (Cambria, 1999) <br /> On June 12 and 13, 2000, Cambria replaced destroyed Well MW-1 and damaged Well MW-2 with <br /> Groundwater Monitoring Wells MW-1 R and MW-2R to depths of 31 5 and 30 feet bgs, respectively <br /> In addition, Cambria drilled and installed two 2-inch diameter wells (MW-9 and MW-10) to a total <br /> depth of 31 5 feet bgs Laboratory analysis of soil samples collected from the soil borings detected <br /> maximum concentrations of TPHg at 0 82 mg/kg (MW8-12') and MtBE at 2 6 mg/kg (MW8-30) <br /> BTEX was not detected above laboratory detection limits Laboratory analysis of groundwater <br /> samples collected from all wells detected maximum concentrations of TPHg at 3,400 Ag/L (VW-1), <br /> benzene at 84µg/L (VW-1), MtBE at 250,000 µg/L, and Tert-butyl Alcohol (TBA) at 17,000 84µg/L <br /> (MW-2R) (Cambria, 2000) <br /> Groundwater monitoring and sampling was initiated in 1992 and are currently sampled quarterly <br /> Depth to groundwater at the site as ranged from 11 to 18 feet bgs In August 2000, an interim <br /> migration control plan at the site was initiated to reduce the amount of petroleum hydrocarbons and <br /> MtBE beneath the site, and to prevent further off-site migration of the dissolved plume The plan <br /> consisted of the periodic extraction of approximately 5,000 gallons of impacted groundwater from <br /> wells historically containing the highest concentrations of petroleum hydrocarbons and MtBE (MW- <br /> 1 R, MW-2R, and VW-1) Remedial extractions continued during the third quarter with a total <br /> extraction 868,000 gallons to date <br />