My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002933
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3202
>
3500 - Local Oversight Program
>
PR0545250
>
ARCHIVED REPORTS_XR0002933
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 7:09:30 PM
Creation date
1/30/2020 4:05:00 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002933
RECORD_ID
PR0545250
PE
3528
FACILITY_ID
FA0001817
FACILITY_NAME
7-ELEVEN INC #35355
STREET_NUMBER
3202
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95209
CURRENT_STATUS
02
SITE_LOCATION
3202 W Hammer Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECOR www setor com <br /> INTERNATIONAL 3017 Kilgore Road Suite 100 <br /> ® <br /> INCORPORATED Rancho Cordova CA 95670 <br /> 916-861-0400 TEL <br /> 91661-0430 Fax <br /> October 21, 2003 a) "� <br /> Ms Vicki McCartney J <br /> San Joaquin County Environmental Health Department tip" I\_N 1, -03 <br /> 304 East Weber Avenue, Third Floor <br /> Stockton, CA 95202 <br /> RE Quarterly Groundwater Monitoring Report—Third Quarter 2003 <br /> ConocoPhillips (Former BP)Station No 11193 <br /> 3202 West Hammer Lane 7� <br /> Stockton, California <br /> SECOR Project Nos 77CP 60193 00 0002/77BP 50193 00 0436 <br /> Dear Ms McCartney <br /> SECOR International Incorporated (SECOR) is providing this report to summarize the third quarter <br /> 2003 groundwater-monitoring event at the above-referenced site <br /> COMPLETED ACTIVITIES—Third Quarter 2003 <br /> • Performed groundwater monitoring and sampling of wells on September 2, 2003 <br /> • Weekly interim groundwater batch extraction performed by Onyx Industrial Services, Inc <br /> .1 (Onyx) <br /> • Prepared and submitted quarterly groundwater monitoring report <br /> • Prepared and submitted "Revised Interim Remedial Action Plan and Work Plan for Ozone <br /> Sparge Well Installation and Additional Off-site Assessment,"dated September 15, 2003 <br /> PLANNED ACTIVITIES —Third Quarter 2003 <br /> • Perform quarterly groundwater monitoring and sampling in <br /> • Prepare and submit quarterly groundwater monitoring report <br /> • Continue with weekly interim groundwater batch extraction performed by Onyx until approval <br /> of revised Interim Remedial Action Plan <br /> • Perform additional assessment <br /> DISCUSSION <br /> On September 2, 2003, SECOR measured groundwater levels within and collected groundwater <br /> samples from eleven wells (MW-IR, MW-2R, MW-3 through MW-10, and VW-1) Depth to water <br /> measurements and calculated groundwater elevation data are included in Table 1 Groundwater <br /> elevation data were used to construct a potentiometric surface map, which is Included as Figure 1 <br /> During the third quarter 2003, the direction of groundwater flow was determined to the northeast, at a <br /> hydraul[cyradient of 0 001 foot per foot (ft/ft) Historical groundwater gradient data are presented in <br /> Table 2 Groundwater elevations decreased by an average of 0 786 foot (ft) from the previous <br /> quarter Field procedures for groundwater monitoring are included in Attachment 1 Field data <br /> sheets showing recorded depth to groundwater levels are included in Attachment 2 <br /> 11ConocoPhillipslTosco Marketmg1111931QMR13QMR03 Final doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.