Laserfiche WebLink
S E C O R <br /> �1 Date May 16, 2003 <br /> Quarter 1 Q03 <br /> CONOCOPHILLIPS QUARTERLY GROUNDWATER MONITORING REPORT <br /> Facility No 11193 Address 3202 West Hammer Lane, Stockton CA <br /> Environmental Engineer Elizabeth Sewell-ConocoPhllllps <br /> Paul Supple-BP <br /> Consulting Co/Contact Person SECOR/Rusty Benkosk <br /> Consultant Protect No 77CP 60193 00 0002 <br /> 77BP 50193 00 0436 <br /> Primary Agency/Regulatory ID No Vicki McCartney-San Joaquin County-Public Health Services <br /> SJCPHS <br /> Assembly Bill 681 Status NIA <br /> WORK PERFORMED THIS QUARTER (First Quarter— 2003): pals°I,il' <br /> 1 Performed groundwater monitoring and sampling of MW-1 R, MW-2R, MW-3 through MW-5, MW-7 yn rye+ <br /> through MW-10, and VW-1 on April 7, 2003 �o <br /> 2 Prepared and submitted Quarterly Groundwater Monitoring Report <br /> WORK PROPOSED FOR NEXT QUARTER (Second Quarter - 2003): <br /> 1 Perform quarterly groundwater monitoring and sampling to be conducted in June 2003 <br /> . 2 Prepare and submit quarterly groundwater monitoring report <br /> QUARTERLY RESULTS SUMMARY <br /> Current Phase of Project Monitoring/Interim Remediation <br /> Frequency of Groundwater <br /> Sampling MR-1 R, MW-2R, MW-3 through MW-10, and VW-1 <br /> sampled quarterly <br /> Frequency of Groundwater <br /> Monitoring Quarterly <br /> Is Free Product(FP) Present --- <br /> Onsite No <br /> Current Remediation Techniques <br /> Migration control via weekly vacuum truck groundwater <br /> extractions <br /> Volume of Groundwater Extracted <br /> this quarter 54,000 gallons <br /> Total Volume of Groundwater <br /> Extracted 706,700 gallons (since August 2000) _ <br /> Approximate Depth to J <br /> Groundwater 12 26 to 13 97ft <br /> Shallow Groundwater <br /> Flow/Gradient Radial!y outward at 0 005 to 0 009 Wit <br /> 1 lcon000Phdhps\Toseo Marketmg1111931QMR11QMR03 doe <br />