My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002935
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3202
>
3500 - Local Oversight Program
>
PR0545250
>
ARCHIVED REPORTS_XR0002935
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 7:19:09 PM
Creation date
1/30/2020 4:06:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002935
RECORD_ID
PR0545250
PE
3528
FACILITY_ID
FA0001817
FACILITY_NAME
7-ELEVEN INC #35355
STREET_NUMBER
3202
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95209
CURRENT_STATUS
02
SITE_LOCATION
3202 W Hammer Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S E C O R <br /> �1 Date May 16, 2003 <br /> Quarter 1 Q03 <br /> CONOCOPHILLIPS QUARTERLY GROUNDWATER MONITORING REPORT <br /> Facility No 11193 Address 3202 West Hammer Lane, Stockton CA <br /> Environmental Engineer Elizabeth Sewell-ConocoPhllllps <br /> Paul Supple-BP <br /> Consulting Co/Contact Person SECOR/Rusty Benkosk <br /> Consultant Protect No 77CP 60193 00 0002 <br /> 77BP 50193 00 0436 <br /> Primary Agency/Regulatory ID No Vicki McCartney-San Joaquin County-Public Health Services <br /> SJCPHS <br /> Assembly Bill 681 Status NIA <br /> WORK PERFORMED THIS QUARTER (First Quarter— 2003): pals°I,il' <br /> 1 Performed groundwater monitoring and sampling of MW-1 R, MW-2R, MW-3 through MW-5, MW-7 yn rye+ <br /> through MW-10, and VW-1 on April 7, 2003 �o <br /> 2 Prepared and submitted Quarterly Groundwater Monitoring Report <br /> WORK PROPOSED FOR NEXT QUARTER (Second Quarter - 2003): <br /> 1 Perform quarterly groundwater monitoring and sampling to be conducted in June 2003 <br /> . 2 Prepare and submit quarterly groundwater monitoring report <br /> QUARTERLY RESULTS SUMMARY <br /> Current Phase of Project Monitoring/Interim Remediation <br /> Frequency of Groundwater <br /> Sampling MR-1 R, MW-2R, MW-3 through MW-10, and VW-1 <br /> sampled quarterly <br /> Frequency of Groundwater <br /> Monitoring Quarterly <br /> Is Free Product(FP) Present --- <br /> Onsite No <br /> Current Remediation Techniques <br /> Migration control via weekly vacuum truck groundwater <br /> extractions <br /> Volume of Groundwater Extracted <br /> this quarter 54,000 gallons <br /> Total Volume of Groundwater <br /> Extracted 706,700 gallons (since August 2000) _ <br /> Approximate Depth to J <br /> Groundwater 12 26 to 13 97ft <br /> Shallow Groundwater <br /> Flow/Gradient Radial!y outward at 0 005 to 0 009 Wit <br /> 1 lcon000Phdhps\Toseo Marketmg1111931QMR11QMR03 doe <br />
The URL can be used to link to this page
Your browser does not support the video tag.