Laserfiche WebLink
S E C 0 R <br /> Ms Vicki McCartney <br /> November 2, 2004 <br /> Page 3 <br /> k <br /> x <br /> QUARTERLY RESULTS SUMMARY <br /> Current Phase of Project —Mon itoring/Assessment/Remediation <br /> Groundwater Monitoring Wells <br /> Sampled MW-1 R, MW-2R, MW-3 through MWA 0, and VW-1 <br /> Sampling Frequency Sampled Quarterly <br /> Groundwater Monitoring <br /> Frequency Quarterly <br /> Is Free Product (FP) Present <br /> Onsite No <br /> Current Remediation Techniques <br /> Operation of the OS system <br /> Total Volume of Groundwater <br /> Extracted 1.017,400 gallons (August 2000—June 2004) <br /> Depth to Groundwater <br /> 13 55 to 15 25 ft bgs <br /> Shallow Groundwater -•••••-_ ,,,..,.._ <br /> Flow/Gradient Northeast/0 001 ft/ft <br /> • LIMITATIONS <br /> This report presents our understanding of existing conditions at the subject site The conclusions <br /> contained herein are based on the analytical results, and professional judgment in accordance with <br /> current standards of professional practice, no other warranty is expressed or implied SECOR <br /> assumes no responsibility for data reported by other consultants or contractors <br /> k Y <br /> 11ConocoPhillipsk"rosco Markedng1111931QMR13QMR04 Final doc a <br />