Laserfiche WebLink
` S E ck0 R <br /> 3017 Kilgore Road Suite 100 <br /> Rancho Cordova CA 95670 <br /> 916-861-0400 TEL <br /> 916-861-0430 Fax <br /> QUARTERLY SUMMARY REPORT <br /> Second Quarter 2004 <br /> 4 <br /> 76 Service Station No 11193 s <br /> 3202 West Hammer Lane <br /> Stockton, California <br /> City/County ID # Stockton <br /> County San Joaquin <br /> PREVIOUS ASSSESSMENT <br /> The site is located at 3202 West Hammer Lane in Stockton, California, and is an operating 76 <br /> service station The site currently contains three gasoline LISTS, associated product lines, and <br /> dispenser <br /> In April 1987, KEI observed the removal of one 1,000-gallon waste oil tank on the southwestern <br /> portion of the site One soil sample was collected from the base of the excavation at <br /> approximately 10 feet below ground surface (bgs) Laboratory analytical results detected <br /> gravimetric waste oil as petroleum oil at 55 parts per million (ppm) (EMCON, 1994) <br /> . Between December 3 and 10, 1992, RESNA performed a preliminary site assessment for British <br /> Petroleum (BP) by drilling four exploratory soil borings (B-1 through B-4) to total depths of 31 5 to <br /> 36 5 feet bgs and converting them to groundwater monitoring wells MW-1 through MW-4 Wells of <br /> MW-1 and MW-2 were installed on the southeast and northwest corners, respectively, of the <br /> underground storage tanks (USTs), MW-3 was installed on the west end of the northern <br /> dispenser island, and MW-4 was installed between the former waste oil tank and the new waste <br /> oil tank Laboratory analytical results for soil detected maximum concentrations of benzene at <br /> 0 1200 ppm (S-21 3-62), toluene at 0 0200 ppm (S-20 0-B1), ethylbenzene at 0 0180 ppm (S- <br /> 21 3-B2), and total xylenes at 0 0240 ppm (S-21 3-B2) Gasoline range total petroleum r <br /> hydrocarbons (TPHg) and diesel range total petroleum hydrocarbons (TPHd) were not detected <br /> above laboratory detection limits Laboratory analytical results for groundwater detected <br /> maximum concentrations of TPHg at 2,200 parts per billion (ppb) (MW-1), benzene at 120 ppb <br /> (MW-2), toluene at 15 ppb (MW-1), ethylbenzene at 1 0 ppb (MW-2), and total xylenes at 24 ppb <br /> (MW-2) TPHd was not detected above laboratory detection limits (RESNA, 1993) <br /> k <br /> In March of 1994, Alisto conducted a supplemental subsurface investigation by drilling and <br /> installing three groundwater monitoring wells (MW-5 through MW-7) to total depths of 31 to 32 <br /> feet bgs Groundwater monitoring well MW-5 was installed on the northeast corner of the <br /> property, MW-6 was installed in an alley west of Kelly Drive, and MW-7 was installed on the north <br /> side of West Hammer Lane Laboratory analysis of soil samples detected maximum <br /> concentrations of benzene at 0 13 ppm (MW-5-16'), toluene at 0 67 ppm (MW-6-16'), and total <br /> xylenes at 0 015 ppm (MW 5 16') TPHg and TPHd were not detected above laboratory detection <br /> limits (EMCON, 1994) <br /> On November 22, 1994, EMCON conducted a supplemental site assessment consisting of <br /> collecting two grab soil samples (TD-2 and TD-3) below the eastern fuel dispensers at the north <br /> and south dispensers, drilling of two soil borings (THP-1, THP-2) to total depths of 26 5 feet bgs, <br /> and the drilling and installation of Vapor Extraction Well VW-1 to a total depth of 17 feet bgs Soil <br /> and hydropunch groundwater samples were collected and analyzed from borings THP-1 and x <br /> THP-2 Laboratory analysis of soil samples TD-2 and TD-3 detected maximum concentrations of ` <br />