Laserfiche WebLink
4 ti y. <br /> BP WELL MONYTORING DATA SHErr <br /> ject#: 01Station# fill 3 <br /> Sampler:' . ti Date: &1-13-0 <br /> Well I.D.: M y•l k Well Diameter: 2 3 6 8 <br /> Total Well Depth: 3 0•t I Depth to Water: 11.► <br /> Depth to Free Product: Thickness of Free Product(feet): <br /> Referenced to: PVC arm D.O. Meter(K req d): YSI HACH <br /> 1` 0.04 4' 0.65 <br /> 2" 0.16 6" 1.47 <br /> 3" 037 Oma mdiuO*0.163 <br /> Purge Me6od: Bauer Satnpling Method: Bails <br /> Disposable Bailey <br /> MkIffietur- Extraction Port <br /> le Other. <br /> Extraction Pump <br /> Other. <br /> 11. 7 X 3 3 J Gain. <br /> 1 Cane Volume(Gals:) Specified Volumes Cakulated Volume <br /> Ttmc T=p(°F} pH ' Cond. Gals. Removed Observaiiow <br /> 1140 '7. 11 j q <br /> ilW7 71.E 34 <br /> Did well dewater? Yrs GD Gallons actually evacuated: 1 b <br /> Sampling Time: b lZ•rJ� Sampling Date: q- ,Lj-o l <br /> Sample LD. (Nj: /41w-112- Laboratory: Other <br /> Analyzed for: B'TFX MTBE TPH-D Other: <br /> O. (if req'd): Pre-purge: 'MI/L Post-purge: MI/ <br /> O.R.P. (if req'd): Pre-purge: mV Post-purge: mV <br /> Ruin Tech Services, Inc. 1680 Rogers Ave,; San Jose, CA 951:12 (408) 573-0555 <br />