Laserfiche WebLink
' 11/81/2001 e9 03 2094693433 FIFTH FLOOR PAGE 02 <br /> PUBLIC HEALTH SERVICES <br /> SAN JOAQUIN COUNTY <br /> ENVIRONMENTAL HEALTH DIVISION ir <br /> Karen Furst, M.D. M.P.H., Health Officer <br /> 304 Easy Weber Avenue, Third Floor • Stockron, CA 95202` a>� <br /> 209/468-3420 <br /> SCOTT HOOTON <br /> BP OIL COMPANY <br /> 295 SW 41r'*' ST ]BLDG 13 SUITE N <br /> RENTON WA 98055 <br /> RE Former BP Oil Sire# 11193 <br /> 3202 W Hammen <br /> Stocleon,CA <br /> WORKPLAN Work Plan for a-Day Dual Phase Extraction Event DAZED 10ZL9 01 <br /> PREPARED BY SECX:)R International,Inc <br /> APPROVED X <br /> DISAPPROVED 0 <br /> ADDENDUM ❑ Sub=by <br /> AD AND AND NECESSARY ELEMENTS OF THE WORKPLAN(H&S 25299 37,subd,(c)(3)) <br /> 1 Canduct a 5-d ,dual phase extraction(DPH)feasibRtytest use a trailer mounted DrE system., <br /> COMMENTS AND CONDITIONS <br /> I DPE system will run continuous 24 his per day for the 5 days <br /> 2 Effluent extracted groundwater will be sampled at the start-up of the system,once each day and prior to <br /> termination of the test <br /> 3 Laboratoryanatysis of vapor and groundwater samples for total petroleum hydrocarbons,BTEX,and fuel <br /> oxygenating compounds- <br /> 4 NoufyPHS/EBD at Icast 48 hours prior to the proposed scheduled work dates <br /> 5 Please forward copies of all reports to MartyHastzell at the CVRWQCB <br /> DATED I—PAZZ BY _ <br /> Sam Sav>g EIIS <br /> LOP/Site Mitigation Umt IV <br /> Cc CVRWQCB—Marty Hartzell <br /> SECOR International,Inc —Rusty Benkosky <br /> Tosco Corporation—David Carmlle <br /> LWB Development,Inc <br /> A Division of San Joaquin County Health Cage Servi<zs <br />