Laserfiche WebLink
• • s <br /> EXPLANATION <br /> + Groundwater monitoring well <br /> lill Vapor extraction well <br /> S x Destroyed groundwater <br /> monitoring well <br /> Former MW-9 <br /> waste Oil <br /> Tank <br /> \\ W <br /> t <br /> MW-4yMW-3 <br /> J <br /> 1 Station T o W <br /> I <br /> Building CL a <br /> Waste Oil Dispenser t <br /> Tank Islands = <br /> H <br /> W <br /> Underground 3 <br /> Storage Tanks �. <br /> MW-2 # <br /> MW-10 kI�l � *MW-5 <br /> t 11 1 <br /> MW-1+ j I I_i VW-1 <br /> X Planter <br /> MW-1 +MW-8 <br /> Transforrner <br /> planter Driveway <br /> �pilvew —_ <br /> ay I <br /> MLEY DRIVE 0 40 <br /> Source Fgure modkfied from dmwmg prov=ded by EMCON Northwest Inc Scale In Feet <br /> SITE PLAN nGURE <br /> GETTLER - RYA11 1110. Tosca (Former BP) Service Station No. 11193 <br /> 6747 Sierra Ct, Suite J 3202 West Hammer Lane <br /> Dublin, CA 94568 (925) 551-7555 Stockton, California 2 <br /> PROJECT NUMBER REVIEWED BY DATE REVISED DATE <br /> 140205 11/01 <br /> RLE NAME P EN19R0 TOSCO 11193 0-11193 OWC I Layout Tab Remedial Status 11-01 <br />