Laserfiche WebLink
EMC®R Associates' <br /> 1433 North Market Boulevard•Sacramento,California 95834-19431. �gli6),928 33130• F9x(93 6)928-3341 <br /> F�br3 1995 <br /> ProjMW2)191.02 <br /> t <br /> Mr. Steve Sasson <br /> San Joaquin County Public Health Services <br /> Environmental Health Division <br /> P.O. Box 24,& --3V <br /> Stockton, California 95201 <br /> k <br /> Re: Summary of Baseline Assessment Report, Tosco Site No. 11193, Stockton, <br /> California <br /> Dear Mr. Sasson: <br /> EMCON, on behalf of Tosco Northwest Company, is submitting this summary of the <br /> Baseline Assessment Report for Station No. 11193 (former BP Station No. 11193), <br /> located at 3202 West Hammer Lane, Stockton, California. This summary includes: <br /> I <br /> • A description of field activities <br /> I <br /> • A table summarizing the analytical results of dispenser, soil, and groundwater <br /> sampling <br /> • A site plan showing sampling locations <br /> • Copies of logs generated during completion of borings THP-1, THP-2, and ' <br /> VW-1 <br /> Soil cuttings and groundwater generated during drilling and sampling activities supervised <br /> by EMCON were disposed of properly by a California-registered waste hauler after <br /> completion of field activities. <br /> I <br /> If you have any questions, please feel free to call. <br /> I <br /> Sincerely, <br /> EMCON <br /> T <br /> �+\J r1 Ire <br /> Robert H. Husk <br /> Senior Project Geologist <br /> R.G. 4172 <br /> Attachment: Summary of Baseline Assessment Report <br /> k <br /> cc: Larry Silva, Tosco Northwest Company, Seattle <br /> Mike Noll, EMCON, Bothell <br />