Laserfiche WebLink
TABLE 1 -SUMMARY OF RESULTS OF GROUNDWATER SAMPLING <br /> BP OIL COMPANY SERVICE STATION NO.11193 <br /> 3202 WEST HAMMER LANE,STOCKTON,CALIFORNIA <br /> ALISTO PROJECT NO.10-136 <br /> WELL DATE OF CASING DEPTH TO GROUNDWATER TPH-G TPH-D TPH B T E X HVOC DO IAB <br /> ID SAMPLING/ ELEVATION (a) WATER ELEVATION (b) (ppb) (ppb) (ppb) (ppb) (ppb) (ppb) (ppb) (ppb) (ppm) <br /> MONITORING (Feet) (Feet) (Feet) <br /> MW-1 12/21/92 3.97 20.40 -16.43 <br /> 2200 -- --- 56 15 ND<0.5 8.9 --- -- --- <br /> MWA 04/04/93 3.97 15.51 -11.54 160 - _ 9.2 ND<0.5 ND<0.5 0.6 - - PACE <br /> MW-1 04/26!93 3.97 17.25 -13.28 -- - - -- --- --- --- - -- <br /> MW-i 10/05/93 3.97 18.00 -14.03 6000 - 450 41 17 18 -- --- PACE <br /> MW-1 01/07/94 3.97 17.75 -13.78 6600 --- 410 200 45 460 --- PACE <br /> QC-1 (c) 01/07/94 -- --- --- 8700 - --- 460 240 57 600 --- --- PACE <br /> MW-1 04/20/94 3.97 16.98 -13.01 63 - --- ND<0.5 ND<0.5 ND<0.5 ND<0.5 -- 4.0 PACE <br /> QC-1 (c) 04/20/94 -- --- --- ND<50 -- --- ND<0.5 ND<0.5 ND<0.5 ND<0.5 -- PACE <br /> MW-1 04125/94 3.97 16.97 -13.00 --- --- --- --- --- -- - --- <br /> MW-1 07/28/94 3.97 17.41 -13.44 430 -- --- 3.6 1.2 2.4 7.1 -- 3.9 PACE <br /> MW-2 12/21/92 4.82 21.26 -16.44 1500 - - 120 9.6 1.0 24 --- -- <br /> MW-2 04/04/93 4.82 18.45 -13.63 2600 - 460 13 77 81 --- -- PACE <br /> MW-2 04/26/93 4.82 18.11 -13.29 --- --- -- -- --- --- -- --- <br /> MW-2 10/05/93 4.82 18.85 -14.03 1500 - - 3200 120 540 710 --- PACE <br /> MW-2 01/07/94 4.82 18.48 -13.66 1900 --- --- 400 13 56 79 - --- PACE <br /> MW-2 04/20/94 4.82 17.82 -13.00 18000 --- --- 3700 120 610 900 4.3 PACE <br /> MW-2 04/25/94 4.82 17.80 -12.98 -- --- --- --- -- --- --- -- <br /> MW-2 07/28/94 4.82 18.14 -13.32 28000 - --- 5300 80 750 340 --- 4.3 PACE <br /> MW-3 12/21/92 5.15 21.52 -16.37 170 - --- 2.8 ND<0.5 ND<0.5 ND<0.5 --- -- <br /> MW-3 04/04/93 5.15 18.59 -13.44 270 - --- 23 ND<0.5 ND<0.5 ND<0.5 - PACE <br /> MW-3 04/26/93 5.15 18.34 -13.19 -- - - -- -- --- --- - - <br /> MW-3 10/05/93 5.15 19.10 -13.95 920 --- 80 ND<0.5 ND<0.5 1.0 - - PACE <br /> MW-3 01/07/94 5.15 18.82 -13.67 130 -- --- 12 ND<0.5 ND<0.5 1.5 -- - PACE <br /> MW-3 04/20/94 5.15 16.07 -12.92 99 (d) - --- 2.6 ND<0.5 ND<0.5 ND<0.5 --- 3.8 PACE <br /> MW-3 04/25/94 5.15 18.04 -12.89 -- --- --- --- --- --- -- - -- <br /> MW-3 07/28/94 5.15 18.50 -13.35 360 - --- 46 0.9 0.9 2.1 3.6 PACE <br /> MWA 12/21/92 5.43 21.68 -16.25 110 - --- ND<0.5 ND<0.5 ND<0.5 ND<0.5 - --- <br /> MW-4 04/04/93 5.43 18.80 -13.37 180 --- - 1.1 ND<0.5 ND<0.5 0.9 ND (e) PACE <br /> QC-1 (c) 04/04/93 -- --- -- 310 - --- 1.9 ND<0.5 ND<0.5 0.9 - PACE <br /> MW-4 04/26/93 5.43 18.55 -13.12 --- ND<50 ND<5000 - - -- - - -- <br /> MW-4 10/05/93 5.43 19.30 -13.87 140 ND<50 ND<5000 ND<0.5 ND<0.5 ND<0.5 ND<0.5 ND (e) -- PACE <br /> QC-1 (c) 10/05/93 -- -- --- 160 - --- ND<0.5 ND<0.5 ND<0.5 ND<0.5 --- --- PACE <br /> MW-4 01/07/94 5.43 19.05 -13.62 100 -- - ND<0.5 ND<0.5 ND<0.5 ND<0.5 - --- PACT_ <br /> MWA 04/20/94 5.43 18.31 -12.88 74 - --- ND<0.5 ND<0.5 ND<0.5 1.3 --- 4.1 PACE <br /> MWA 04/25/94 5.43 18.28 -12.85 --- - - - -- -- <br /> MW-4 07/28/94 5.43 18.71 -13.28 66 - - ND<0.5 ND<0.5 ND<0.5 ND<0.5 - 4.0 PACE <br /> 06-Sep-94 PAGE 1 <br /> i <br />