Laserfiche WebLink
ALISTO ENGINEERING GROUP <br /> Groundwater Development and Sampling Form <br /> Client: Date: 33 0 <br /> Alisto Project No: /2—/ 36 -0--3L-00-9 Field Personne <br /> Service Station No: I I Address: <br /> Well ID: ��_ 1 Field Activity Well Development ,Well Sampling Product Bailing <br /> 1 . <br /> Casing Diameter: Purge Method_: Well Data <br /> ' RC2 Inch (0.16 Gal/foot) Pump (dispos. Poly Tubing) Depth to Product <br /> 3 Inch (0.37 Gal/foot)' XDisposable Bailers Product Thickness <br /> _a Inch (0.65 Gal/Foot) _.Other /Jtt}epth to Water <br /> ' �4.5 Inch (0.83 Gal/foot) _1.66 PVC Standard Bailer <br /> 6 Inch (1.47 Gal/foot) „3.50 PVC Standard Bailer <br /> Sampling Method: Decontamination Method: <br /> Disposable Bailer Triple Rinse (Liquinox) <br /> Pump Steam Cleaned <br /> Calculated Pure Volume <br /> - at X f, �Gai/Ft = _��Gal X <br /> Total Depth Depth to Water Conversion Casing Vol Vols to Total <br /> of Well Water Column Factor Purge Volume <br /> Well Develovment/Swnp ling Parameters <br /> Time Temp pH Cond. Purge Comments/ Analysis ConW Fresery <br /> OF (Umhos Vol Turbidity Required ner <br /> AM) (Gal) Type <br /> TPH- VOA HC. <br /> G/BTEX <br /> f qTPH- Amber Solvent <br /> 1 ' Diesel Liter Rinsed <br /> EPA 601 VOA <br /> TOG Amber H-50, <br /> 3 <br /> FORM:E53/I21592 <br />