Laserfiche WebLink
1 <br /> ALISTO ENGINEERING GROUP <br /> Groundwater Development and Sampling Form <br /> Client <br /> Date: <br /> Alisto Project No: /0.- 1 - - Field Personnel: <br /> Service Station No: // 1 3 Address:. <br /> Well IDd W 7 Field Activity: Well Development Well Sampling .Product Bailing <br /> ' Casing Diameter: Purge Method: Weil Data: <br /> _Z Inch (0.36 Gal/foot) _k/Pump (dispos. Poly Tubing) Depth to Product <br /> ' 3 Inch (0.37 Gal/foot) .,Disposable Sailers Product Thickness <br /> 4 Tach (0.65 Gal/Foot) Other i7 5x Depth to Water <br /> _4.5 Tach (0.83 Gal/foot) _1.66 PVC Standard Bailer <br /> ' _6 Inch (1.47 Gal/foot) 3.50 PVC Standard Bailer <br /> Samviine Method: Decontamination Method: k <br /> ' Disi)osabie Bailer /Triple Rinse (Liquinox) <br /> Steam-Cleaned <br /> Pump � <br /> ' CalcuIated Pure Volume <br /> Z t: <br /> /7, 5r,, IL12Lft X ,/G GaI/Ft = 1"G Gal X - G 7 i <br /> Totalepth- Depth to Water Conversion Casing Vol Vols to Total <br /> Purge Volume <br /> of Well Water Column Factor <br /> i <br /> Well Develooment/Samp ling Parameters <br /> 1 <br /> 701 <br /> ond. Purge Comments/ Analysis Cori tai Presery <br /> umhos Vol Turbidity Required ner <br /> cm) (Gai) TypeGTVOA HCLTPH- Amber 5oivent <br /> Diesel Liter Rinsed <br /> ZJ EPA 601 VOA <br /> TOG Amber F504 <br /> �5208F liter <br /> 1 I • <br /> FORM:FSM21592 y •;' <br />