My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002964
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3202
>
3500 - Local Oversight Program
>
PR0545250
>
ARCHIVED REPORTS_XR0002964
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 5:33:16 PM
Creation date
1/30/2020 4:37:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002964
RECORD_ID
PR0545250
PE
3528
FACILITY_ID
FA0001817
FACILITY_NAME
7-ELEVEN INC #35355
STREET_NUMBER
3202
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95209
CURRENT_STATUS
02
SITE_LOCATION
3202 W Hammer Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GROUNDWATER`MONITORING AND,SAMPLING REPORT , <br /> Company Service Station.No. 11193 t <br /> BP. Oil Co p y - <br /> 3202 West Hammer Lane <br /> ' Stockton, California <br /> Project No. 10-136-01-002 ' <br /> December 28, 1993 <br /> INTRODUCTION <br /> This report presents the results and findings of thekOctober 5,1993 groundwater monitoring <br /> and sampling conducted by Alisto Engirieering'Group at BP Oil Company Service Station <br /> No. 11193, 3202 West Hammer Lane, Stockton, California. A site vicinity-map is shown in 1 <br /> Figure 1. <br /> FIELD PROCEDURES <br /> Field activities were performed in accordance with the procedures and guidelines of <br /> San Joaquin County Public Health Services and the California Regional Water Quality, <br /> Control Board, Central Valley Region. <br /> . ' Before purging and sampling, the groundwater level in each well was measured from a <br /> permanent mark,on the top of the casing to the nearest 01.01 foot using an electronic sounder. <br /> The depth to groundwater and top of casing elevation data were used to calculate the <br /> groundwater elevation in each well in reference to mean sea level. The survey data and <br /> groundwater elevation' measurements collected to date are presented in Tabled. <br /> Before sample collection, each well was purged of.3 casing volumes, while recording field. <br /> readings'of pH, temperature, and electrical conductivity. Groundwater samples were <br /> collected for laboratory analysis by lowering a bottom-fill, disposable bailer to just below the <br /> water level in the well. The samples were transferred from the bailer into laboratory- <br /> supplied containers. The water sampling field survey forms are presented in Appendix A. <br /> SAMPLING AND ANALYTICAL RESULTS.. , <br /> The results of monitoring and laboratory'analysis of m <br /> the groundwater samples for this and <br /> previous quarters are summarized in Table 1. The potentiometric groundwater elevations as <br /> interpreted from the results of this monitoring event are shown in Figure 2. The results of <br /> groundwater analysis are shown in Figure 3. The laboratory report and chain of custody <br /> record are presented in Appendix B. <br />
The URL can be used to link to this page
Your browser does not support the video tag.